1,055 delay minutes

The biggest share (27%) of the delay picked up at Kirkcaldy in the four weeks to 9 December 2023 came from other operator causes.

32% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track222%8% 1 a day, the most in 5 years-
Signals, points and power374%16% 1 a day, more than 1 of the other 4 years1
Weather and structures10610%7% 4 a day, more than 2 of the other 4 years-
Autumn25824%7% 9 a day, more than 3 of the other 4 years-
External6<1%4% 0 a day, the least in 5 years-
Network management242%17% 1 a day, the least in 5 years-
The operators' causes
Train faults767%16% 3 a day, the least in 5 years1
Traincrew585%11% 2 a day, more than 1 of the other 4 years-
Stations565%3% 2 a day, the least in 5 years-
Operations13012%5% 5 a day, more than 3 of the other 4 years-
Operator, other28227%7% 10 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T249
TTLeaf fall Neutral198
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)130
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions78
MDTechnical failures below the solebar57
MPRail / wheel interface, adhesion problems (including ice on the running rail)52
TGDriver50
RBPassengers joining/alighting41
VHPassenger Communication cord, door egress or emergency train alarm operated33
ICTrack circuit failure (including no fault found)17
Since 2018
CodeWhat Network Rail loggedMinutes
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)10,251
TGDriver4,788
MDTechnical failures below the solebar3,842
Q3NZ Pumps T3,705
RBPassengers joining/alighting3,496
ZUNo Cause Identified After investigation by both Parties2,065
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions1,990
MPRail / wheel interface, adhesion problems (including ice on the running rail)1,957
TTLeaf fall Neutral1,864
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,659