Keith
486 delay minutes
The biggest share (31%) of the delay picked up at Keith in the four weeks to 9 December 2023 came from weather and structures.
49% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 55 | 11% | 8% | 2 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 93 | 19% | 16% | 3 a day, more than 2 of the other 4 years | - |
| Weather and structures | 149 | 31% | 7% | 5 a day, more than 2 of the other 4 years | - |
| Autumn | 18 | 4% | 7% | 1 a day, more than 1 of the other 4 years | - |
| External | 7 | 1% | 4% | 0 a day, the least in 5 years | - |
| Network management | 55 | 11% | 17% | 2 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 39 | 8% | 16% | 1 a day, more than 3 of the other 4 years | - |
| Traincrew | 30 | 6% | 11% | 1 a day, the least in 5 years | - |
| Stations | 11 | 2% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 12 | 2% | 5% | 0 a day, the most in 5 years | - |
| Operator, other | 18 | 4% | 7% | 1 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 65 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 55 |
| IC | Track circuit failure (including no fault found) | 44 |
| X9 | Points failure caused by severe snow or ice where heaters are fitted and working as designed | 40 |
| ZU | No Cause Identified After investigation by both Parties | 40 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 37 |
| TG | Driver | 29 |
| IK | Telecom equipment failure (including no fault found) | 23 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 18 |
| Q3 | NZ Pumps T | 18 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZU | No Cause Identified After investigation by both Parties | 8,242 |
| TG | Driver | 1,846 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 1,846 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 1,206 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 955 |
| Q3 | NZ Pumps T | 923 |
| MD | Technical failures below the solebar | 664 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 660 |
| Q1 | Takeback Pumps | 578 |
| M8 | Technical failures above the Solebar | 568 |