Leaves on the Line

London Kings Cross

KGX East Coast route
CSV JSON

5,403 delay minutes

The biggest share (26%) of the delay picked up at London Kings Cross in the four weeks to 9 December 2023 came from signal, points and power faults.

79% of these minutes were knock-on from something that happened elsewhere first. 75% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track3006%8% 11 a day, more than 3 of the other 4 years-
Signals, points and power1,43026%16% 51 a day, the most in 5 years22
Weather and structures57711%7% 21 a day, the most in 5 years16
Autumn811%7% 3 a day, more than 3 of the other 4 years-
External3717%4% 13 a day, more than 2 of the other 4 years3
Network management93917%17% 34 a day, more than 3 of the other 4 years58
The operators' causes
Train faults66012%16% 24 a day, more than 2 of the other 4 years20
Traincrew73814%11% 26 a day, the most in 5 years74
Stations1242%3% 4 a day, more than 3 of the other 4 years-
Operations29<1%5% 1 a day, more than 1 of the other 4 years-
Operator, other1553%7% 6 a day, more than 3 of the other 4 years2

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
I1Overhead line/third rail defect999
TGDriver442
I8Animal Strike or Incursion within the control of Network Rail342
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.277
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)271
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail261
XRCable vandalism or theft232
TITraincrew rostering problem217
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)159
J0Telecom equipment radio failure (GSM-R)134
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver27,327
I1Overhead line/third rail defect15,328
IBPoints failure (including no fault found)11,975
TITraincrew rostering problem11,920
M8Technical failures above the Solebar9,678
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail8,614
MNBrake and brake systems faults; including wheel flats where no other cause had been identified7,849
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.7,200
MUDepot operating problem7,114
MDTechnical failures below the solebar7,085