Kingussie
290 delay minutes
The biggest share (49%) of the delay picked up at Kingussie in the four weeks to 9 December 2023 came from weather and structures.
42% of these minutes were knock-on from something that happened elsewhere first. 69% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 64 | 22% | 8% | 2 a day, the most in 5 years | - |
| Signals, points and power | - | - | 16% | 0 a day, the least in 5 years | - |
| Weather and structures | 141 | 49% | 7% | 5 a day, the most in 5 years | - |
| Autumn | 3 | <1% | 7% | 0 a day, the least in 5 years | - |
| External | 3 | 1% | 4% | 0 a day, more than 1 of the other 4 years | - |
| Network management | 29 | 10% | 17% | 1 a day, more than 1 of the other 4 years | 1 |
| The operators' causes | |||||
| Train faults | 35 | 12% | 16% | 1 a day, more than 2 of the other 4 years | - |
| Traincrew | 7 | 2% | 11% | 0 a day, more than 1 of the other 4 years | - |
| Stations | 6 | 2% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 3 | <1% | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JK | Flooding not due to exceptional weather | 89 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 64 |
| IW | Non severe weather - snow/ice/frost affecting infrastructure equipment excluding points | 39 |
| M7 | Door and Door system faults | 25 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 9 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 8 |
| QM | Train schedule/STP Process including erroneous simplifiers | 7 |
| TG | Driver | 7 |
| MD | Technical failures below the solebar | 6 |
| OK | Delay caused by Operating staff oversight, issues or absence (excluding signallers and Control) | 6 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 1,119 |
| ZU | No Cause Identified After investigation by both Parties | 1,067 |
| MC | Diesel Loco failure, defect, attention | 883 |
| IC | Track circuit failure (including no fault found) | 741 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 732 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 662 |
| TG | Driver | 624 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 497 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 489 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 478 |