Kilmarnock
643 delay minutes
The biggest share (30%) of the delay picked up at Kilmarnock in the four weeks to 9 December 2023 came from how the network was run.
54% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 61 | 9% | 16% | 2 a day, more than 1 of the other 4 years | 1 |
| Weather and structures | 78 | 12% | 7% | 3 a day, more than 3 of the other 4 years | 2 |
| Autumn | 12 | 2% | 7% | 0 a day, more than 1 of the other 4 years | - |
| External | 45 | 7% | 4% | 2 a day, the most in 5 years | 3 |
| Network management | 195 | 30% | 17% | 7 a day, more than 2 of the other 4 years | 19 |
| The operators' causes | |||||
| Train faults | 106 | 16% | 16% | 4 a day, more than 2 of the other 4 years | 4 |
| Traincrew | 36 | 6% | 11% | 1 a day, more than 1 of the other 4 years | 2 |
| Stations | 32 | 5% | 3% | 1 a day, more than 2 of the other 4 years | - |
| Operations | 26 | 4% | 5% | 1 a day, more than 2 of the other 4 years | - |
| Operator, other | 52 | 8% | 7% | 2 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZU | No Cause Identified After investigation by both Parties | 151 |
| MD | Technical failures below the solebar | 46 |
| XP | BRIDGE HIT | 45 |
| VW | Severe weather affecting passenger Fleet equipment including follwogin company standards/policies or Rule book instructions | 42 |
| X9 | Points failure caused by severe snow or ice where heaters are fitted and working as designed | 37 |
| TG | Driver | 34 |
| II | Signalling lineside cable fault | 32 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 32 |
| M8 | Technical failures above the Solebar | 30 |
| IB | Points failure (including no fault found) | 23 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZU | No Cause Identified After investigation by both Parties | 7,118 |
| MD | Technical failures below the solebar | 2,430 |
| TG | Driver | 2,412 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 1,732 |
| IB | Points failure (including no fault found) | 1,644 |
| XR | Cable vandalism or theft | 1,507 |
| IA | Signal failure (including no fault found) | 1,443 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 1,375 |
| M8 | Technical failures above the Solebar | 1,367 |
| IG | Block failure | 1,240 |