Leaves on the Line

Kilmarnock

KMK Scotland route
CSV JSON

643 delay minutes

The biggest share (30%) of the delay picked up at Kilmarnock in the four weeks to 9 December 2023 came from how the network was run.

54% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power619%16% 2 a day, more than 1 of the other 4 years1
Weather and structures7812%7% 3 a day, more than 3 of the other 4 years2
Autumn122%7% 0 a day, more than 1 of the other 4 years-
External457%4% 2 a day, the most in 5 years3
Network management19530%17% 7 a day, more than 2 of the other 4 years19
The operators' causes
Train faults10616%16% 4 a day, more than 2 of the other 4 years4
Traincrew366%11% 1 a day, more than 1 of the other 4 years2
Stations325%3% 1 a day, more than 2 of the other 4 years-
Operations264%5% 1 a day, more than 2 of the other 4 years-
Operator, other528%7% 2 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ZUNo Cause Identified After investigation by both Parties151
MDTechnical failures below the solebar46
XPBRIDGE HIT45
VWSevere weather affecting passenger Fleet equipment including follwogin company standards/policies or Rule book instructions42
X9Points failure caused by severe snow or ice where heaters are fitted and working as designed37
TGDriver34
IISignalling lineside cable fault32
RQUn-booked assistance for a person with reduced mobility joining/alighting,32
M8Technical failures above the Solebar30
IBPoints failure (including no fault found)23
Since 2018
CodeWhat Network Rail loggedMinutes
ZUNo Cause Identified After investigation by both Parties7,118
MDTechnical failures below the solebar2,430
TGDriver2,412
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions1,732
IBPoints failure (including no fault found)1,644
XRCable vandalism or theft1,507
IASignal failure (including no fault found)1,443
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure1,375
M8Technical failures above the Solebar1,367
IGBlock failure1,240