Knighton
625 delay minutes
The biggest share (27%) of the delay picked up at Knighton in the four weeks to 9 December 2023 came from faulty trains.
75% of these minutes were knock-on from something that happened elsewhere first. 84% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 109 | 17% | 16% | 4 a day, the most in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 7 | 1% | 7% | 0 a day, more than 1 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 104 | 17% | 17% | 4 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 167 | 27% | 16% | 6 a day, the most in 5 years | - |
| Traincrew | 104 | 17% | 11% | 4 a day, the most in 5 years | - |
| Stations | 72 | 12% | 3% | 3 a day, the most in 5 years | - |
| Operations | 48 | 8% | 5% | 2 a day, more than 3 of the other 4 years | - |
| Operator, other | 14 | 2% | 7% | 1 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 74 |
| M9 | Reported fleet equipment defect - no fault found | 69 |
| T2 | Delay at unstaffed station to non-DOO train | 69 |
| TH | (Senior) Conductor/Train Manager | 56 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 48 |
| TZ | Other Passenger Train Operating Company causes | 48 |
| TG | Driver | 39 |
| M8 | Technical failures above the Solebar | 37 |
| M7 | Door and Door system faults | 32 |
| IC | Track circuit failure (including no fault found) | 18 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 2,236 |
| MD | Technical failures below the solebar | 1,151 |
| T2 | Delay at unstaffed station to non-DOO train | 869 |
| TG | Driver | 678 |
| IL | Token equipment failure (including no fault found) | 670 |
| M8 | Technical failures above the Solebar | 666 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 624 |
| TZ | Other Passenger Train Operating Company causes | 542 |
| TH | (Senior) Conductor/Train Manager | 474 |
| IK | Telecom equipment failure (including no fault found) | 402 |