The biggest share (42%) of the delay picked up at Kensington (Olympia) in the four weeks to 9 December 2023 came from signal, points and power faults.
51% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 21 | 3% | 8% | 1 a day, the most in 5 years | - |
| Signals, points and power | 321 | 42% | 16% | 11 a day, the most in 5 years | - |
| Weather and structures | 10 | 1% | 7% | 0 a day, the most in 5 years | - |
| Autumn | 5 | <1% | 7% | 0 a day, more than 3 of the other 4 years | - |
| External | 37 | 5% | 4% | 1 a day, the most in 5 years | - |
| Network management | 141 | 18% | 17% | 5 a day, more than 2 of the other 4 years | 3 |
| The operators' causes | |||||
| Train faults | 33 | 4% | 16% | 1 a day, more than 1 of the other 4 years | - |
| Traincrew | 92 | 12% | 11% | 3 a day, more than 3 of the other 4 years | - |
| Stations | 39 | 5% | 3% | 1 a day, more than 2 of the other 4 years | 1 |
| Operations | 47 | 6% | 5% | 2 a day, the most in 5 years | - |
| Operator, other | 26 | 3% | 7% | 1 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 144 |
| IA | Signal failure (including no fault found) | 111 |
| TG | Driver | 87 |
| I1 | Overhead line/third rail defect | 37 |
| RB | Passengers joining/alighting | 34 |
| OR | LOM directive or Signaller correctly applying local instructions (ex late running trains or infrastructure Accepted Limitation) | 33 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 31 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 31 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 26 |
| FO | Time Lost en-route believed to be operator cause and information required from Operator (Ops Responsibility) | 24 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 2,412 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,912 |
| IC | Track circuit failure (including no fault found) | 1,710 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,491 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 979 |
| RB | Passengers joining/alighting | 890 |
| IB | Points failure (including no fault found) | 840 |
| OR | LOM directive or Signaller correctly applying local instructions (ex late running trains or infrastructure Accepted Limitation) | 671 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 660 |
| M8 | Technical failures above the Solebar | 446 |