The biggest share (42%) of the delay picked up at Kensington (Olympia) in the four weeks to 9 December 2023 came from signal, points and power faults.

51% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track213%8% 1 a day, the most in 5 years-
Signals, points and power32142%16% 11 a day, the most in 5 years-
Weather and structures101%7% 0 a day, the most in 5 years-
Autumn5<1%7% 0 a day, more than 3 of the other 4 years-
External375%4% 1 a day, the most in 5 years-
Network management14118%17% 5 a day, more than 2 of the other 4 years3
The operators' causes
Train faults334%16% 1 a day, more than 1 of the other 4 years-
Traincrew9212%11% 3 a day, more than 3 of the other 4 years-
Stations395%3% 1 a day, more than 2 of the other 4 years1
Operations476%5% 2 a day, the most in 5 years-
Operator, other263%7% 1 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure144
IASignal failure (including no fault found)111
TGDriver87
I1Overhead line/third rail defect37
RBPassengers joining/alighting34
ORLOM directive or Signaller correctly applying local instructions (ex late running trains or infrastructure Accepted Limitation)33
OCSignaller including mis-routing (not ERTM /ETCS related)31
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)31
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)26
FOTime Lost en-route believed to be operator cause and information required from Operator (Ops Responsibility)24
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver2,412
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)1,912
ICTrack circuit failure (including no fault found)1,710
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,491
OCSignaller including mis-routing (not ERTM /ETCS related)979
RBPassengers joining/alighting890
IBPoints failure (including no fault found)840
ORLOM directive or Signaller correctly applying local instructions (ex late running trains or infrastructure Accepted Limitation)671
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.660
M8Technical failures above the Solebar446