Kirkwood
0 delay minutes
No delay was picked up at Kirkwood in the four weeks to 9 December 2023.
100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | 1 |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Nothing logged. | ||
| Code | What Network Rail logged | Minutes |
|---|---|---|
| M8 | Technical failures above the Solebar | 35 |
| QM | Train schedule/STP Process including erroneous simplifiers | 26 |
| TG | Driver | 25 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 18 |
| IB | Points failure (including no fault found) | 15 |
| FH | FOC Planning issue (not diagramming or rostering) | 12 |
| IC | Track circuit failure (including no fault found) | 10 |
| X8 | Animal Strike or incursion not within the control of Network Rail | 10 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 9 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 7 |