Kilwinning
226 delay minutes
The biggest share (24%) of the delay picked up at Kilwinning in the four weeks to 9 December 2023 came from how the network was run.
72% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 42 | 19% | 16% | 2 a day, more than 2 of the other 4 years | - |
| Weather and structures | 6 | 3% | 7% | 0 a day, more than 2 of the other 4 years | - |
| Autumn | 29 | 13% | 7% | 1 a day, the most in 5 years | - |
| External | 7 | 3% | 4% | 0 a day, more than 2 of the other 4 years | - |
| Network management | 54 | 24% | 17% | 2 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 3 | 1% | 16% | 0 a day, the least in 5 years | - |
| Traincrew | 27 | 12% | 11% | 1 a day, the most in 5 years | - |
| Stations | 12 | 5% | 3% | 0 a day, more than 3 of the other 4 years | - |
| Operations | 19 | 8% | 5% | 1 a day, more than 3 of the other 4 years | - |
| Operator, other | 28 | 12% | 7% | 1 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 27 |
| J8 | OTM DAMAGE | 25 |
| Q3 | NZ Pumps T | 22 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 21 |
| TA | Train-crew/loco/stock/unit diagram issues | 19 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 17 |
| IA | Signal failure (including no fault found) | 12 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 12 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 10 |
| IB | Points failure (including no fault found) | 9 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 1,508 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,489 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 1,398 |
| IB | Points failure (including no fault found) | 1,056 |
| TG | Driver | 1,010 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 765 |
| IA | Signal failure (including no fault found) | 756 |
| IC | Track circuit failure (including no fault found) | 741 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 715 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 611 |