226 delay minutes

The biggest share (24%) of the delay picked up at Kilwinning in the four weeks to 9 December 2023 came from how the network was run.

72% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power4219%16% 2 a day, more than 2 of the other 4 years-
Weather and structures63%7% 0 a day, more than 2 of the other 4 years-
Autumn2913%7% 1 a day, the most in 5 years-
External73%4% 0 a day, more than 2 of the other 4 years-
Network management5424%17% 2 a day, more than 3 of the other 4 years-
The operators' causes
Train faults31%16% 0 a day, the least in 5 years-
Traincrew2712%11% 1 a day, the most in 5 years-
Stations125%3% 0 a day, more than 3 of the other 4 years-
Operations198%5% 1 a day, more than 3 of the other 4 years-
Operator, other2812%7% 1 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver27
J8OTM DAMAGE25
Q3NZ Pumps T22
MPRail / wheel interface, adhesion problems (including ice on the running rail)21
TATrain-crew/loco/stock/unit diagram issues19
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles17
IASignal failure (including no fault found)12
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)12
RQUn-booked assistance for a person with reduced mobility joining/alighting,10
IBPoints failure (including no fault found)9
Since 2018
CodeWhat Network Rail loggedMinutes
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure1,508
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,489
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail1,398
IBPoints failure (including no fault found)1,056
TGDriver1,010
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)765
IASignal failure (including no fault found)756
ICTrack circuit failure (including no fault found)741
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions715
I8Animal Strike or Incursion within the control of Network Rail611