Kyle of Lochalsh
55 delay minutes
The biggest share (40%) of the delay picked up at Kyle of Lochalsh in the four weeks to 9 December 2023 came from how the network was run.
16% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | 9 | 16% | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | 22 | 40% | 17% | - |
| The operators' causes | ||||
| Train faults | 4 | 7% | 16% | 1 |
| Traincrew | 17 | 31% | 11% | - |
| Stations | 3 | 5% | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZU | No Cause Identified After investigation by both Parties | 22 |
| TG | Driver | 17 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 9 |
| MD | Technical failures below the solebar | 4 |
| RB | Passengers joining/alighting | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 1,338 |
| ZU | No Cause Identified After investigation by both Parties | 735 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 495 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 381 |
| TG | Driver | 368 |
| MD | Technical failures below the solebar | 313 |
| RB | Passengers joining/alighting | 182 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 167 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 162 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 156 |