Largs
162 delay minutes
The biggest share (27%) of the delay picked up at Largs in the four weeks to 9 December 2023 came from autumn leaves.
77% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 9 | 6% | 16% | 0 a day, more than 1 of the other 4 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 44 | 27% | 7% | 2 a day, the most in 5 years | - |
| External | 3 | 2% | 4% | 0 a day, more than 2 of the other 4 years | - |
| Network management | 27 | 17% | 17% | 1 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | - | - | 16% | 0 a day, the least in 5 years | 2 |
| Traincrew | 26 | 16% | 11% | 1 a day, the most in 5 years | 2 |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | 24 | 15% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 29 | 18% | 7% | 1 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 26 |
| Q3 | NZ Pumps T | 25 |
| TA | Train-crew/loco/stock/unit diagram issues | 24 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 24 |
| OE | Failure to lay Sandite or operate Railhead Conditioning train as programmed | 19 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 14 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 7 |
| QM | Train schedule/STP Process including erroneous simplifiers | 6 |
| IC | Track circuit failure (including no fault found) | 5 |
| J0 | Telecom equipment radio failure (GSM-R) | 4 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 751 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 746 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 466 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 364 |
| IB | Points failure (including no fault found) | 347 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 342 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 300 |
| M8 | Technical failures above the Solebar | 270 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 257 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 252 |