Most of the delay picked up at Laurencekirk in the four weeks to 9 December 2023 came from weather and structures.

13% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track71%8% 0 a day, more than 3 of the other 4 years-
Signals, points and power396%16% 1 a day, the least in 5 years-
Weather and structures41660%7% 15 a day, the most in 5 years-
Autumn3<1%7% 0 a day, the least in 5 years-
External172%4% 1 a day, more than 3 of the other 4 years-
Network management16724%17% 6 a day, the most in 5 years1
The operators' causes
Train faults6<1%16% 0 a day, more than 1 of the other 4 years-
Traincrew193%11% 1 a day, the most in 5 years-
Stations3<1%3% 0 a day, more than 1 of the other 4 years-
Operations91%5% 0 a day, the most in 5 years-
Operator, other91%7% 0 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions360
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)149
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure44
IASignal failure (including no fault found)24
TGDriver19
XPBRIDGE HIT17
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure12
X9Points failure caused by severe snow or ice where heaters are fitted and working as designed12
ZUNo Cause Identified After investigation by both Parties12
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)9
Since 2018
CodeWhat Network Rail loggedMinutes
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions2,680
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,159
ZUNo Cause Identified After investigation by both Parties1,041
IASignal failure (including no fault found)942
OLSignal Box not open during booked hours921
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)827
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure789
TGDriver541
MDTechnical failures below the solebar522
M8Technical failures above the Solebar480