Ladybank
1,409 delay minutes
The biggest share (18%) of the delay picked up at Ladybank in the four weeks to 9 December 2023 came from signal, points and power faults.
50% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 44 | 3% | 8% | 2 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 257 | 18% | 16% | 9 a day, the most in 5 years | - |
| Weather and structures | 156 | 11% | 7% | 6 a day, more than 1 of the other 4 years | - |
| Autumn | 139 | 10% | 7% | 5 a day, more than 3 of the other 4 years | - |
| External | 64 | 5% | 4% | 2 a day, more than 3 of the other 4 years | - |
| Network management | 214 | 15% | 17% | 8 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 174 | 12% | 16% | 6 a day, more than 3 of the other 4 years | - |
| Traincrew | 75 | 5% | 11% | 3 a day, more than 2 of the other 4 years | - |
| Stations | 61 | 4% | 3% | 2 a day, more than 3 of the other 4 years | - |
| Operations | 66 | 5% | 5% | 2 a day, more than 3 of the other 4 years | - |
| Operator, other | 160 | 11% | 7% | 6 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 139 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 122 |
| ZU | No Cause Identified After investigation by both Parties | 113 |
| IB | Points failure (including no fault found) | 100 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 99 |
| TT | Leaf fall Neutral | 85 |
| MD | Technical failures below the solebar | 81 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 66 |
| M8 | Technical failures above the Solebar | 63 |
| OL | Signal Box not open during booked hours | 62 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZU | No Cause Identified After investigation by both Parties | 5,305 |
| OL | Signal Box not open during booked hours | 3,337 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 3,038 |
| MD | Technical failures below the solebar | 3,005 |
| TG | Driver | 2,940 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 2,144 |
| IC | Track circuit failure (including no fault found) | 1,940 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,872 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 1,712 |
| M8 | Technical failures above the Solebar | 1,560 |