1,409 delay minutes

The biggest share (18%) of the delay picked up at Ladybank in the four weeks to 9 December 2023 came from signal, points and power faults.

50% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track443%8% 2 a day, more than 3 of the other 4 years-
Signals, points and power25718%16% 9 a day, the most in 5 years-
Weather and structures15611%7% 6 a day, more than 1 of the other 4 years-
Autumn13910%7% 5 a day, more than 3 of the other 4 years-
External645%4% 2 a day, more than 3 of the other 4 years-
Network management21415%17% 8 a day, more than 2 of the other 4 years-
The operators' causes
Train faults17412%16% 6 a day, more than 3 of the other 4 years-
Traincrew755%11% 3 a day, more than 2 of the other 4 years-
Stations614%3% 2 a day, more than 3 of the other 4 years-
Operations665%5% 2 a day, more than 3 of the other 4 years-
Operator, other16011%7% 6 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T139
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure122
ZUNo Cause Identified After investigation by both Parties113
IBPoints failure (including no fault found)100
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions99
TTLeaf fall Neutral85
MDTechnical failures below the solebar81
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)66
M8Technical failures above the Solebar63
OLSignal Box not open during booked hours62
Since 2018
CodeWhat Network Rail loggedMinutes
ZUNo Cause Identified After investigation by both Parties5,305
OLSignal Box not open during booked hours3,337
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions3,038
MDTechnical failures below the solebar3,005
TGDriver2,940
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)2,144
ICTrack circuit failure (including no fault found)1,940
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,872
MNBrake and brake systems faults; including wheel flats where no other cause had been identified1,712
M8Technical failures above the Solebar1,560