Leominster
426 delay minutes
The biggest share (32%) of the delay picked up at Leominster in the four weeks to 9 December 2023 came from faulty trains.
48% of these minutes were knock-on from something that happened elsewhere first. 88% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 14 | 3% | 8% | 1 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 106 | 25% | 16% | 4 a day, the most in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 7 | 2% | 7% | 0 a day, the most in 5 years | - |
| External | 19 | 4% | 4% | 1 a day, more than 3 of the other 4 years | - |
| Network management | 27 | 6% | 17% | 1 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 135 | 32% | 16% | 5 a day, the most in 5 years | - |
| Traincrew | 29 | 7% | 11% | 1 a day, more than 3 of the other 4 years | - |
| Stations | 42 | 10% | 3% | 2 a day, the most in 5 years | - |
| Operations | 43 | 10% | 5% | 2 a day, more than 3 of the other 4 years | - |
| Operator, other | 4 | <1% | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| M9 | Reported fleet equipment defect - no fault found | 53 |
| T2 | Delay at unstaffed station to non-DOO train | 42 |
| MD | Technical failures below the solebar | 39 |
| TZ | Other Passenger Train Operating Company causes | 39 |
| J0 | Telecom equipment radio failure (GSM-R) | 31 |
| IK | Telecom equipment failure (including no fault found) | 27 |
| M8 | Technical failures above the Solebar | 26 |
| TG | Driver | 21 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 17 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 16 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 985 |
| MD | Technical failures below the solebar | 952 |
| J0 | Telecom equipment radio failure (GSM-R) | 869 |
| TZ | Other Passenger Train Operating Company causes | 856 |
| TG | Driver | 773 |
| T2 | Delay at unstaffed station to non-DOO train | 724 |
| M8 | Technical failures above the Solebar | 700 |
| OU | Delays not Investigated by Network Rail | 523 |
| M9 | Reported fleet equipment defect - no fault found | 344 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 337 |