64 delay minutes

Most of the delay picked up at Lingfield in the four weeks to 9 December 2023 came from faulty trains.

0% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults64100%16%2
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MYCoupler, Coupler system and Jumper cable faults64
Since 2018
CodeWhat Network Rail loggedMinutes
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)291
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)140
TGDriver121
I7Engineer's train late into, from or failed in possession92
MYCoupler, Coupler system and Jumper cable faults64
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)60
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)55
OBDelayed by signaller not applying applicable regulating policy54
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)52