Leaves on the Line

Langside

LGS Scotland route
CSV JSON

452 delay minutes

The biggest share (26%) of the delay picked up at Langside in the four weeks to 9 December 2023 came from how the network was run.

78% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track3<1%8% 0 a day, the least in 5 years-
Signals, points and power296%16% 1 a day, more than 2 of the other 4 years1
Weather and structures6915%7% 2 a day, the most in 5 years-
Autumn5312%7% 2 a day, more than 2 of the other 4 years-
External51%4% 0 a day, more than 1 of the other 4 years-
Network management11926%17% 4 a day, more than 3 of the other 4 years-
The operators' causes
Train faults6214%16% 2 a day, more than 2 of the other 4 years-
Traincrew4510%11% 2 a day, more than 2 of the other 4 years-
Stations82%3% 0 a day, the least in 5 years-
Operations143%5% 0 a day, the least in 5 years-
Operator, other4710%7% 2 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
X9Points failure caused by severe snow or ice where heaters are fitted and working as designed66
Q3NZ Pumps T44
MPRail / wheel interface, adhesion problems (including ice on the running rail)41
TGDriver40
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)22
ZUNo Cause Identified After investigation by both Parties22
IPPoints failure caused by snow or frost where heaters are fitted but found to be not turned on, not operative or defective19
M8Technical failures above the Solebar19
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)17
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)15
Since 2018
CodeWhat Network Rail loggedMinutes
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)2,271
TGDriver1,855
IBPoints failure (including no fault found)1,296
ZUNo Cause Identified After investigation by both Parties1,010
M8Technical failures above the Solebar761
Q3NZ Pumps T684
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)658
OCSignaller including mis-routing (not ERTM /ETCS related)609
MPRail / wheel interface, adhesion problems (including ice on the running rail)589
OUDelays not Investigated by Network Rail471