484 delay minutes

The biggest share (27%) of the delay picked up at Lochwinnoch in the four weeks to 9 December 2023 came from autumn leaves.

55% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track3<1%8% 0 a day, more than 1 of the other 4 years-
Signals, points and power5812%16% 2 a day, more than 2 of the other 4 years-
Weather and structures327%7% 1 a day, more than 3 of the other 4 years-
Autumn13227%7% 5 a day, more than 3 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management6914%17% 2 a day, more than 2 of the other 4 years-
The operators' causes
Train faults4710%16% 2 a day, more than 3 of the other 4 years-
Traincrew255%11% 1 a day, more than 3 of the other 4 years-
Stations194%3% 1 a day, more than 2 of the other 4 years-
Operations112%5% 0 a day, the least in 5 years-
Operator, other8918%7% 3 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T85
MPRail / wheel interface, adhesion problems (including ice on the running rail)62
IASignal failure (including no fault found)58
OEFailure to lay Sandite or operate Railhead Conditioning train as programmed47
J8OTM DAMAGE37
M7Door and Door system faults32
X9Points failure caused by severe snow or ice where heaters are fitted and working as designed32
TGDriver25
TTLeaf fall Neutral24
RQUn-booked assistance for a person with reduced mobility joining/alighting,11
Since 2018
CodeWhat Network Rail loggedMinutes
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)4,289
IBPoints failure (including no fault found)2,509
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure2,106
Q3NZ Pumps T1,579
TGDriver1,562
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail1,225
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure1,224
ICTrack circuit failure (including no fault found)1,199
MPRail / wheel interface, adhesion problems (including ice on the running rail)1,179
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions1,147