Lochwinnoch
484 delay minutes
The biggest share (27%) of the delay picked up at Lochwinnoch in the four weeks to 9 December 2023 came from autumn leaves.
55% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 3 | <1% | 8% | 0 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 58 | 12% | 16% | 2 a day, more than 2 of the other 4 years | - |
| Weather and structures | 32 | 7% | 7% | 1 a day, more than 3 of the other 4 years | - |
| Autumn | 132 | 27% | 7% | 5 a day, more than 3 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 69 | 14% | 17% | 2 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 47 | 10% | 16% | 2 a day, more than 3 of the other 4 years | - |
| Traincrew | 25 | 5% | 11% | 1 a day, more than 3 of the other 4 years | - |
| Stations | 19 | 4% | 3% | 1 a day, more than 2 of the other 4 years | - |
| Operations | 11 | 2% | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 89 | 18% | 7% | 3 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 85 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 62 |
| IA | Signal failure (including no fault found) | 58 |
| OE | Failure to lay Sandite or operate Railhead Conditioning train as programmed | 47 |
| J8 | OTM DAMAGE | 37 |
| M7 | Door and Door system faults | 32 |
| X9 | Points failure caused by severe snow or ice where heaters are fitted and working as designed | 32 |
| TG | Driver | 25 |
| TT | Leaf fall Neutral | 24 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 11 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 4,289 |
| IB | Points failure (including no fault found) | 2,509 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,106 |
| Q3 | NZ Pumps T | 1,579 |
| TG | Driver | 1,562 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 1,225 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 1,224 |
| IC | Track circuit failure (including no fault found) | 1,199 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 1,179 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 1,147 |