Leaves on the Line

Linlithgow

LIN Scotland route
CSV JSON

108 delay minutes

The biggest share (22%) of the delay picked up at Linlithgow in the four weeks to 9 December 2023 came from faulty trains.

81% of these minutes were knock-on from something that happened elsewhere first. 93% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track55%8% 0 a day, more than 1 of the other 4 years-
Signals, points and power1312%16% 0 a day, more than 3 of the other 4 years-
Weather and structures1413%7% 1 a day, the most in 5 years-
Autumn66%7% 0 a day, more than 1 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management1817%17% 1 a day, more than 1 of the other 4 years-
The operators' causes
Train faults2422%16% 1 a day, more than 2 of the other 4 years1
Traincrew33%11% 0 a day, the least in 5 years1
Stations1211%3% 0 a day, more than 2 of the other 4 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other1312%7% 0 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
M8Technical failures above the Solebar18
JKFlooding not due to exceptional weather12
RQUn-booked assistance for a person with reduced mobility joining/alighting,11
IISignalling lineside cable fault10
VHPassenger Communication cord, door egress or emergency train alarm operated9
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)7
OCSignaller including mis-routing (not ERTM /ETCS related)6
IRBroken/cracked/twisted/buckled/flawed rail5
MPRail / wheel interface, adhesion problems (including ice on the running rail)4
Q3NZ Pumps T4
Since 2018
CodeWhat Network Rail loggedMinutes
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure3,017
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions866
TGDriver785
JKFlooding not due to exceptional weather701
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)525
ICTrack circuit failure (including no fault found)480
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure452
IBPoints failure (including no fault found)371
RQUn-booked assistance for a person with reduced mobility joining/alighting,349
IRBroken/cracked/twisted/buckled/flawed rail349