Linlithgow
108 delay minutes
The biggest share (22%) of the delay picked up at Linlithgow in the four weeks to 9 December 2023 came from faulty trains.
81% of these minutes were knock-on from something that happened elsewhere first. 93% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 5 | 5% | 8% | 0 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 13 | 12% | 16% | 0 a day, more than 3 of the other 4 years | - |
| Weather and structures | 14 | 13% | 7% | 1 a day, the most in 5 years | - |
| Autumn | 6 | 6% | 7% | 0 a day, more than 1 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 18 | 17% | 17% | 1 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 24 | 22% | 16% | 1 a day, more than 2 of the other 4 years | 1 |
| Traincrew | 3 | 3% | 11% | 0 a day, the least in 5 years | 1 |
| Stations | 12 | 11% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 13 | 12% | 7% | 0 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| M8 | Technical failures above the Solebar | 18 |
| JK | Flooding not due to exceptional weather | 12 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 11 |
| II | Signalling lineside cable fault | 10 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 9 |
| OK | Delay caused by Operating staff oversight, issues or absence (excluding signallers and Control) | 7 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 6 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 5 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 4 |
| Q3 | NZ Pumps T | 4 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 3,017 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 866 |
| TG | Driver | 785 |
| JK | Flooding not due to exceptional weather | 701 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 525 |
| IC | Track circuit failure (including no fault found) | 480 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 452 |
| IB | Points failure (including no fault found) | 371 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 349 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 349 |