Llanelli
2,668 delay minutes
The biggest share (21%) of the delay picked up at Llanelli in the four weeks to 9 December 2023 came from traincrew problems.
61% of these minutes were knock-on from something that happened elsewhere first. 89% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 47 | 2% | 8% | 2 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 370 | 14% | 16% | 13 a day, the most in 5 years | 1 |
| Weather and structures | 40 | 1% | 7% | 1 a day, more than 1 of the other 4 years | - |
| Autumn | 319 | 12% | 7% | 11 a day, the most in 5 years | - |
| External | 72 | 3% | 4% | 3 a day, the most in 5 years | - |
| Network management | 251 | 9% | 17% | 9 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 437 | 16% | 16% | 16 a day, the most in 5 years | 4 |
| Traincrew | 569 | 21% | 11% | 20 a day, the most in 5 years | - |
| Stations | 205 | 8% | 3% | 7 a day, the most in 5 years | - |
| Operations | 222 | 8% | 5% | 8 a day, the most in 5 years | - |
| Operator, other | 137 | 5% | 7% | 5 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 207 |
| T2 | Delay at unstaffed station to non-DOO train | 198 |
| TZ | Other Passenger Train Operating Company causes | 198 |
| TH | (Senior) Conductor/Train Manager | 184 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 126 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 124 |
| TT | Leaf fall Neutral | 116 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 114 |
| Q3 | NZ Pumps T | 110 |
| QI | Cautioning due to railhead leaf contamination | 106 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| T2 | Delay at unstaffed station to non-DOO train | 5,600 |
| MD | Technical failures below the solebar | 4,427 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 4,335 |
| TG | Driver | 3,380 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 2,935 |
| TH | (Senior) Conductor/Train Manager | 2,894 |
| M8 | Technical failures above the Solebar | 2,833 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 2,581 |
| IC | Track circuit failure (including no fault found) | 2,545 |
| IA | Signal failure (including no fault found) | 2,267 |