Leaves on the Line

Llandudno Junction

LLJ Wales route
CSV JSON

2,931 delay minutes

The biggest share (20%) of the delay picked up at Llandudno Junction in the four weeks to 9 December 2023 came from faulty trains.

50% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track38213%8% 14 a day, the most in 5 years-
Signals, points and power2127%16% 8 a day, more than 3 of the other 4 years5
Weather and structures1114%7% 4 a day, more than 3 of the other 4 years1
Autumn2699%7% 10 a day, the most in 5 years1
External672%4% 2 a day, more than 3 of the other 4 years1
Network management2167%17% 8 a day, more than 2 of the other 4 years19
The operators' causes
Train faults59420%16% 21 a day, more than 3 of the other 4 years20
Traincrew55619%11% 20 a day, the most in 5 years5
Stations1636%3% 6 a day, more than 3 of the other 4 years-
Operations1304%5% 5 a day, more than 3 of the other 4 years2
Operator, other2328%7% 8 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
JSCondition of Track TSR outside the Timetable Planning Rules364
TGDriver360
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps223
Q3NZ Pumps T209
TTLeaf fall Neutral209
T2Delay at unstaffed station to non-DOO train146
TH(Senior) Conductor/Train Manager119
TZOther Passenger Train Operating Company causes113
M9Reported fleet equipment defect - no fault found102
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)79
Since 2018
CodeWhat Network Rail loggedMinutes
T2Delay at unstaffed station to non-DOO train12,438
TGDriver9,009
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps5,738
MDTechnical failures below the solebar4,533
TH(Senior) Conductor/Train Manager4,525
OUDelays not Investigated by Network Rail4,250
M8Technical failures above the Solebar3,573
TZOther Passenger Train Operating Company causes3,377
M9Reported fleet equipment defect - no fault found2,759
IHPower Supply And Distribution System Failure2,487