688 delay minutes

The biggest share (30%) of the delay picked up at Llandrindod in the four weeks to 9 December 2023 came from how the network was run.

29% of these minutes were knock-on from something that happened elsewhere first. 70% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power487%16% 2 a day, the most in 5 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn142%7% 1 a day, more than 2 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management20630%17% 7 a day, the most in 5 years1
The operators' causes
Train faults11417%16% 4 a day, the most in 5 years4
Traincrew12218%11% 4 a day, more than 3 of the other 4 years1
Stations10816%3% 4 a day, the most in 5 years-
Operations7611%5% 3 a day, the most in 5 years-
Operator, other--7% 0 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)189
T2Delay at unstaffed station to non-DOO train108
TH(Senior) Conductor/Train Manager102
TZOther Passenger Train Operating Company causes76
M8Technical failures above the Solebar39
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure35
M7Door and Door system faults25
MDTechnical failures below the solebar25
TGDriver20
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps18
Since 2018
CodeWhat Network Rail loggedMinutes
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)5,163
T2Delay at unstaffed station to non-DOO train1,260
TGDriver1,005
MDTechnical failures below the solebar805
ILToken equipment failure (including no fault found)728
M8Technical failures above the Solebar687
TH(Senior) Conductor/Train Manager645
OZOther Network Rail operating causes589
IKTelecom equipment failure (including no fault found)525
TZOther Passenger Train Operating Company causes495