Llandrindod
688 delay minutes
The biggest share (30%) of the delay picked up at Llandrindod in the four weeks to 9 December 2023 came from how the network was run.
29% of these minutes were knock-on from something that happened elsewhere first. 70% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 48 | 7% | 16% | 2 a day, the most in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 14 | 2% | 7% | 1 a day, more than 2 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 206 | 30% | 17% | 7 a day, the most in 5 years | 1 |
| The operators' causes | |||||
| Train faults | 114 | 17% | 16% | 4 a day, the most in 5 years | 4 |
| Traincrew | 122 | 18% | 11% | 4 a day, more than 3 of the other 4 years | 1 |
| Stations | 108 | 16% | 3% | 4 a day, the most in 5 years | - |
| Operations | 76 | 11% | 5% | 3 a day, the most in 5 years | - |
| Operator, other | - | - | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 189 |
| T2 | Delay at unstaffed station to non-DOO train | 108 |
| TH | (Senior) Conductor/Train Manager | 102 |
| TZ | Other Passenger Train Operating Company causes | 76 |
| M8 | Technical failures above the Solebar | 39 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 35 |
| M7 | Door and Door system faults | 25 |
| MD | Technical failures below the solebar | 25 |
| TG | Driver | 20 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 18 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 5,163 |
| T2 | Delay at unstaffed station to non-DOO train | 1,260 |
| TG | Driver | 1,005 |
| MD | Technical failures below the solebar | 805 |
| IL | Token equipment failure (including no fault found) | 728 |
| M8 | Technical failures above the Solebar | 687 |
| TH | (Senior) Conductor/Train Manager | 645 |
| OZ | Other Network Rail operating causes | 589 |
| IK | Telecom equipment failure (including no fault found) | 525 |
| TZ | Other Passenger Train Operating Company causes | 495 |