Llandovery
304 delay minutes
The biggest share (36%) of the delay picked up at Llandovery in the four weeks to 9 December 2023 came from how the network was run.
49% of these minutes were knock-on from something that happened elsewhere first. 91% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | 88 | 29% | 16% | 1 |
| Weather and structures | - | - | 7% | - |
| Autumn | 19 | 6% | 7% | - |
| External | - | - | 4% | - |
| Network management | 108 | 36% | 17% | - |
| The operators' causes | ||||
| Train faults | 60 | 20% | 16% | 2 |
| Traincrew | 13 | 4% | 11% | 1 |
| Stations | 8 | 3% | 3% | - |
| Operations | 3 | <1% | 5% | - |
| Operator, other | 5 | 2% | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 85 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 50 |
| IC | Track circuit failure (including no fault found) | 31 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 26 |
| IL | Token equipment failure (including no fault found) | 14 |
| QI | Cautioning due to railhead leaf contamination | 14 |
| IH | Power Supply And Distribution System Failure | 13 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 13 |
| M8 | Technical failures above the Solebar | 10 |
| T2 | Delay at unstaffed station to non-DOO train | 8 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 1,612 |
| MD | Technical failures below the solebar | 340 |
| IL | Token equipment failure (including no fault found) | 338 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 323 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 320 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 267 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 253 |
| T2 | Delay at unstaffed station to non-DOO train | 190 |
| TG | Driver | 188 |
| M8 | Technical failures above the Solebar | 162 |