The biggest share (32%) of the delay picked up at Lanark in the four weeks to 9 December 2023 came from faulty trains.

75% of these minutes were knock-on from something that happened elsewhere first. 84% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track102%8% 0 a day, the least in 5 years-
Signals, points and power12021%16% 4 a day, more than 3 of the other 4 years-
Weather and structures295%7% 1 a day, more than 3 of the other 4 years3
Autumn305%7% 1 a day, more than 1 of the other 4 years-
External112%4% 0 a day, more than 1 of the other 4 years-
Network management478%17% 2 a day, more than 1 of the other 4 years1
The operators' causes
Train faults18832%16% 7 a day, the most in 5 years1
Traincrew7012%11% 3 a day, more than 3 of the other 4 years-
Stations71%3% 0 a day, more than 1 of the other 4 years-
Operations264%5% 1 a day, more than 3 of the other 4 years-
Operator, other437%7% 2 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)75
IASignal failure (including no fault found)64
TGDriver50
M8Technical failures above the Solebar34
ICTrack circuit failure (including no fault found)30
MNBrake and brake systems faults; including wheel flats where no other cause had been identified26
MPRail / wheel interface, adhesion problems (including ice on the running rail)22
Q3NZ Pumps T22
AHCustomer or off Network Rail network yard equipment breakdown/reduced capacity16
MBElectic Loco failure, defect, attention16
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver2,687
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions2,159
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)1,335
M8Technical failures above the Solebar857
IBPoints failure (including no fault found)838
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.792
ICTrack circuit failure (including no fault found)785
IASignal failure (including no fault found)700
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)676
MDTechnical failures below the solebar669