Llanwrtyd
843 delay minutes
The biggest share (26%) of the delay picked up at Llanwrtyd in the four weeks to 9 December 2023 came from traincrew problems.
71% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 157 | 19% | 16% | 6 a day, more than 3 of the other 4 years | 2 |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 27 | 3% | 7% | 1 a day, more than 3 of the other 4 years | - |
| External | 32 | 4% | 4% | 1 a day, the most in 5 years | - |
| Network management | 99 | 12% | 17% | 4 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 139 | 16% | 16% | 5 a day, the most in 5 years | 7 |
| Traincrew | 221 | 26% | 11% | 8 a day, more than 3 of the other 4 years | 2 |
| Stations | 72 | 9% | 3% | 3 a day, the most in 5 years | - |
| Operations | 96 | 11% | 5% | 3 a day, the most in 5 years | - |
| Operator, other | - | - | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TH | (Senior) Conductor/Train Manager | 125 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 103 |
| TZ | Other Passenger Train Operating Company causes | 96 |
| TI | Traincrew rostering problem | 85 |
| T2 | Delay at unstaffed station to non-DOO train | 72 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 50 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 47 |
| M8 | Technical failures above the Solebar | 45 |
| XP | BRIDGE HIT | 32 |
| QI | Cautioning due to railhead leaf contamination | 27 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 1,569 |
| TG | Driver | 1,379 |
| IL | Token equipment failure (including no fault found) | 995 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 925 |
| T2 | Delay at unstaffed station to non-DOO train | 884 |
| M8 | Technical failures above the Solebar | 872 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 852 |
| IB | Points failure (including no fault found) | 773 |
| TH | (Senior) Conductor/Train Manager | 720 |
| TZ | Other Passenger Train Operating Company causes | 588 |