Lenzie
1,924 delay minutes
The biggest share (17%) of the delay picked up at Lenzie in the four weeks to 9 December 2023 came from faulty trains.
92% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 53 | 3% | 8% | 2 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 211 | 11% | 16% | 8 a day, more than 2 of the other 4 years | - |
| Weather and structures | 210 | 11% | 7% | 8 a day, more than 3 of the other 4 years | - |
| Autumn | 228 | 12% | 7% | 8 a day, the most in 5 years | - |
| External | 17 | <1% | 4% | 1 a day, the least in 5 years | - |
| Network management | 285 | 15% | 17% | 10 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 336 | 17% | 16% | 12 a day, more than 3 of the other 4 years | - |
| Traincrew | 144 | 7% | 11% | 5 a day, more than 3 of the other 4 years | - |
| Stations | 34 | 2% | 3% | 1 a day, the least in 5 years | - |
| Operations | 130 | 7% | 5% | 5 a day, more than 3 of the other 4 years | - |
| Operator, other | 278 | 14% | 7% | 10 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 206 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 183 |
| TG | Driver | 120 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 113 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 94 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 88 |
| M8 | Technical failures above the Solebar | 77 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 70 |
| MD | Technical failures below the solebar | 61 |
| I2 | AC/DC trip (including no fault or cause found) | 49 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 10,023 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 7,131 |
| TG | Driver | 5,874 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 4,209 |
| M8 | Technical failures above the Solebar | 4,008 |
| MD | Technical failures below the solebar | 3,552 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 3,311 |
| M7 | Door and Door system faults | 2,386 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,347 |
| IB | Points failure (including no fault found) | 2,037 |