Leaves on the Line

Lairg

LRG Scotland route
CSV JSON

266 delay minutes

The biggest share (33%) of the delay picked up at Lairg in the four weeks to 9 December 2023 came from traincrew problems.

38% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track42%8% 0 a day, more than 2 of the other 4 years-
Signals, points and power145%16% 1 a day, more than 1 of the other 4 years-
Weather and structures4517%7% 2 a day, more than 3 of the other 4 years-
Autumn124%7% 0 a day, more than 3 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management156%17% 1 a day, more than 2 of the other 4 years-
The operators' causes
Train faults7528%16% 3 a day, the most in 5 years-
Traincrew8733%11% 3 a day, the most in 5 years-
Stations31%3% 0 a day, the most in 5 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other124%7% 0 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver87
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)45
MDTechnical failures below the solebar45
M8Technical failures above the Solebar23
ICTrack circuit failure (including no fault found)14
MPRail / wheel interface, adhesion problems (including ice on the running rail)12
Q3NZ Pumps T12
ZUNo Cause Identified After investigation by both Parties9
M9Reported fleet equipment defect - no fault found7
I6Delays as a result of line blocks / track patrols (including late handback)6
Since 2018
CodeWhat Network Rail loggedMinutes
ZUNo Cause Identified After investigation by both Parties1,307
TGDriver940
MDTechnical failures below the solebar933
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions742
I0Telecom equipment legacy radio failures (RETB)428
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.387
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)365
IBPoints failure (including no fault found)339
MPRail / wheel interface, adhesion problems (including ice on the running rail)314
JBReactionary Delay to 'P' coded TSRs314