Lairg
266 delay minutes
The biggest share (33%) of the delay picked up at Lairg in the four weeks to 9 December 2023 came from traincrew problems.
38% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 4 | 2% | 8% | 0 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 14 | 5% | 16% | 1 a day, more than 1 of the other 4 years | - |
| Weather and structures | 45 | 17% | 7% | 2 a day, more than 3 of the other 4 years | - |
| Autumn | 12 | 4% | 7% | 0 a day, more than 3 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 15 | 6% | 17% | 1 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 75 | 28% | 16% | 3 a day, the most in 5 years | - |
| Traincrew | 87 | 33% | 11% | 3 a day, the most in 5 years | - |
| Stations | 3 | 1% | 3% | 0 a day, the most in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 12 | 4% | 7% | 0 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 87 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 45 |
| MD | Technical failures below the solebar | 45 |
| M8 | Technical failures above the Solebar | 23 |
| IC | Track circuit failure (including no fault found) | 14 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 12 |
| Q3 | NZ Pumps T | 12 |
| ZU | No Cause Identified After investigation by both Parties | 9 |
| M9 | Reported fleet equipment defect - no fault found | 7 |
| I6 | Delays as a result of line blocks / track patrols (including late handback) | 6 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZU | No Cause Identified After investigation by both Parties | 1,307 |
| TG | Driver | 940 |
| MD | Technical failures below the solebar | 933 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 742 |
| I0 | Telecom equipment legacy radio failures (RETB) | 428 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 387 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 365 |
| IB | Points failure (including no fault found) | 339 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 314 |
| JB | Reactionary Delay to 'P' coded TSRs | 314 |