553 delay minutes

The biggest share (24%) of the delay picked up at Larkhall in the four weeks to 9 December 2023 came from autumn leaves.

95% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track122%8% 0 a day, more than 1 of the other 4 years-
Signals, points and power326%16% 1 a day, more than 1 of the other 4 years5
Weather and structures428%7% 2 a day, more than 3 of the other 4 years2
Autumn13224%7% 5 a day, more than 3 of the other 4 years-
External5<1%4% 0 a day, more than 2 of the other 4 years-
Network management5510%17% 2 a day, more than 2 of the other 4 years-
The operators' causes
Train faults8816%16% 3 a day, more than 3 of the other 4 years1
Traincrew5310%11% 2 a day, more than 3 of the other 4 years2
Stations112%3% 0 a day, more than 3 of the other 4 years-
Operations326%5% 1 a day, more than 3 of the other 4 years-
Operator, other9217%7% 3 a day, more than 3 of the other 4 years2

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T76
MPRail / wheel interface, adhesion problems (including ice on the running rail)52
QICautioning due to railhead leaf contamination30
TTLeaf fall Neutral24
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident22
TGDriver22
FCFreight Train Driver error, SPAD, Wrong routing or Missed AWS/DSD [No change]21
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)20
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure20
QHAdhesion problems due to leaf contamination16
Since 2018
CodeWhat Network Rail loggedMinutes
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)1,923
TGDriver1,721
MPRail / wheel interface, adhesion problems (including ice on the running rail)892
IBPoints failure (including no fault found)863
Q3NZ Pumps T850
M8Technical failures above the Solebar710
M7Door and Door system faults561
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)489
VBVandalism or theft457
ICTrack circuit failure (including no fault found)429