Llanhilleth
39 delay minutes
Most of the delay picked up at Llanhilleth in the four weeks to 9 December 2023 came from traincrew problems.
100% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | 39 | 100% | 11% | 1 |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 39 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 39 |
| IA | Signal failure (including no fault found) | 37 |
| TZ | Other Passenger Train Operating Company causes | 23 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 22 |
| OU | Delays not Investigated by Network Rail | 13 |
| M8 | Technical failures above the Solebar | 12 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 6 |
| J3 | Axle Counter Failure | 6 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 6 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 5 |