Lewes
2,288 delay minutes
The biggest share (27%) of the delay picked up at Lewes in the four weeks to 9 December 2023 came from how the network was run.
42% of these minutes were knock-on from something that happened elsewhere first. 70% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 344 | 15% | 8% | 12 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 254 | 11% | 16% | 9 a day, more than 2 of the other 4 years | - |
| Weather and structures | 600 | 26% | 7% | 21 a day, more than 3 of the other 4 years | 2 |
| Autumn | 5 | <1% | 7% | 0 a day, more than 1 of the other 4 years | - |
| External | 89 | 4% | 4% | 3 a day, more than 3 of the other 4 years | - |
| Network management | 622 | 27% | 17% | 22 a day, more than 3 of the other 4 years | 3 |
| The operators' causes | |||||
| Train faults | 172 | 8% | 16% | 6 a day, more than 3 of the other 4 years | - |
| Traincrew | 124 | 5% | 11% | 4 a day, more than 1 of the other 4 years | - |
| Stations | 8 | <1% | 3% | 0 a day, the least in 5 years | - |
| Operations | 22 | <1% | 5% | 1 a day, the least in 5 years | - |
| Operator, other | 48 | 2% | 7% | 2 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 433 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 316 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 259 |
| JK | Flooding not due to exceptional weather | 161 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 129 |
| TG | Driver | 99 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 95 |
| M8 | Technical failures above the Solebar | 70 |
| XB | Vandalism or theft (including the placing of objects on the line) | 62 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 59 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 10,825 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 9,331 |
| TG | Driver | 6,801 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 6,194 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 5,784 |
| IC | Track circuit failure (including no fault found) | 4,119 |
| OB | Delayed by signaller not applying applicable regulating policy | 4,086 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 3,415 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 2,413 |
| M8 | Technical failures above the Solebar | 2,353 |