2,288 delay minutes

The biggest share (27%) of the delay picked up at Lewes in the four weeks to 9 December 2023 came from how the network was run.

42% of these minutes were knock-on from something that happened elsewhere first. 70% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track34415%8% 12 a day, more than 3 of the other 4 years-
Signals, points and power25411%16% 9 a day, more than 2 of the other 4 years-
Weather and structures60026%7% 21 a day, more than 3 of the other 4 years2
Autumn5<1%7% 0 a day, more than 1 of the other 4 years-
External894%4% 3 a day, more than 3 of the other 4 years-
Network management62227%17% 22 a day, more than 3 of the other 4 years3
The operators' causes
Train faults1728%16% 6 a day, more than 3 of the other 4 years-
Traincrew1245%11% 4 a day, more than 1 of the other 4 years-
Stations8<1%3% 0 a day, the least in 5 years-
Operations22<1%5% 1 a day, the least in 5 years-
Operator, other482%7% 2 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)433
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.316
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)259
JKFlooding not due to exceptional weather161
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)129
TGDriver99
OCSignaller including mis-routing (not ERTM /ETCS related)95
M8Technical failures above the Solebar70
XBVandalism or theft (including the placing of objects on the line)62
MNBrake and brake systems faults; including wheel flats where no other cause had been identified59
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)10,825
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.9,331
TGDriver6,801
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)6,194
OCSignaller including mis-routing (not ERTM /ETCS related)5,784
ICTrack circuit failure (including no fault found)4,119
OBDelayed by signaller not applying applicable regulating policy4,086
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure3,415
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles2,413
M8Technical failures above the Solebar2,353