757 delay minutes

The biggest share (27%) of the delay picked up at Milford Haven in the four weeks to 9 December 2023 came from faulty trains.

94% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track243%8% 1 a day, the most in 5 years-
Signals, points and power19426%16% 7 a day, the most in 5 years1
Weather and structures111%7% 0 a day, more than 2 of the other 4 years-
Autumn2<1%7% 0 a day, more than 3 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management8812%17% 3 a day, more than 3 of the other 4 years-
The operators' causes
Train faults20127%16% 7 a day, the most in 5 years6
Traincrew8511%11% 3 a day, the most in 5 years7
Stations7210%3% 3 a day, the most in 5 years-
Operations7310%5% 3 a day, the most in 5 years-
Operator, other7<1%7% 0 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps149
IISignalling lineside cable fault88
T2Delay at unstaffed station to non-DOO train50
RDAttaching/detaching/shunter/watering37
TGDriver33
TH(Senior) Conductor/Train Manager31
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)27
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards26
ICTrack circuit failure (including no fault found)25
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.24
Since 2018
CodeWhat Network Rail loggedMinutes
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps1,554
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)1,275
MDTechnical failures below the solebar998
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure940
M8Technical failures above the Solebar866
TGDriver692
OUDelays not Investigated by Network Rail649
ZYUnivestigated station overtime System Roll-up Only616
ICTrack circuit failure (including no fault found)607
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure542