Mount Florida
823 delay minutes
The biggest share (22%) of the delay picked up at Mount Florida in the four weeks to 9 December 2023 came from how the network was run.
72% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 6 | <1% | 8% | 0 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 44 | 5% | 16% | 2 a day, more than 1 of the other 4 years | - |
| Weather and structures | 10 | 1% | 7% | 0 a day, the least in 5 years | - |
| Autumn | 130 | 16% | 7% | 5 a day, the most in 5 years | - |
| External | 29 | 4% | 4% | 1 a day, the most in 5 years | - |
| Network management | 179 | 22% | 17% | 6 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 147 | 18% | 16% | 5 a day, more than 3 of the other 4 years | - |
| Traincrew | 95 | 12% | 11% | 3 a day, more than 2 of the other 4 years | - |
| Stations | 36 | 4% | 3% | 1 a day, more than 2 of the other 4 years | - |
| Operations | 31 | 4% | 5% | 1 a day, more than 2 of the other 4 years | - |
| Operator, other | 117 | 14% | 7% | 4 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 106 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 98 |
| TG | Driver | 91 |
| QM | Train schedule/STP Process including erroneous simplifiers | 41 |
| M7 | Door and Door system faults | 37 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 34 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 32 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 28 |
| M8 | Technical failures above the Solebar | 27 |
| JT | Points failure caused by snow or frost where heaters are not fitted | 23 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 3,438 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 2,902 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 2,626 |
| IB | Points failure (including no fault found) | 2,577 |
| M8 | Technical failures above the Solebar | 1,568 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,256 |
| RB | Passengers joining/alighting | 1,202 |
| Q3 | NZ Pumps T | 1,140 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 1,137 |
| M7 | Door and Door system faults | 882 |