Leaves on the Line

Mitcham Junction

MIJ Sussex route
CSV JSON

412 delay minutes

The biggest share (42%) of the delay picked up at Mitcham Junction in the four weeks to 9 December 2023 came from signal, points and power faults.

58% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power17142%16% 6 a day, the most in 5 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn3<1%7% 0 a day, the least in 5 years-
External4<1%4% 0 a day, more than 1 of the other 4 years-
Network management11227%17% 4 a day, the least in 5 years-
The operators' causes
Train faults287%16% 1 a day, more than 2 of the other 4 years-
Traincrew389%11% 1 a day, the least in 5 years1
Stations3<1%3% 0 a day, more than 1 of the other 4 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other5413%7% 2 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
J3Axle Counter Failure114
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)49
TGDriver34
I1Overhead line/third rail defect31
VHPassenger Communication cord, door egress or emergency train alarm operated31
OCSignaller including mis-routing (not ERTM /ETCS related)22
VISecurity alert affecting stations and depots17
ICTrack circuit failure (including no fault found)12
IBPoints failure (including no fault found)9
MNBrake and brake systems faults; including wheel flats where no other cause had been identified9
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,419
TGDriver2,627
VHPassenger Communication cord, door egress or emergency train alarm operated2,582
OCSignaller including mis-routing (not ERTM /ETCS related)1,588
OBDelayed by signaller not applying applicable regulating policy1,400
M8Technical failures above the Solebar1,152
J3Axle Counter Failure1,126
IBPoints failure (including no fault found)844
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure835
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.774