CSV JSON

387 delay minutes

The biggest share (25%) of the delay picked up at Milngavie in the four weeks to 9 December 2023 came from other operator causes.

93% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track174%8% 1 a day, the least in 5 years-
Signals, points and power62%16% 0 a day, the least in 5 years12
Weather and structures133%7% 0 a day, more than 2 of the other 4 years1
Autumn9324%7% 3 a day, more than 2 of the other 4 years-
External41%4% 0 a day, more than 1 of the other 4 years-
Network management4812%17% 2 a day, more than 2 of the other 4 years6
The operators' causes
Train faults5414%16% 2 a day, more than 2 of the other 4 years-
Traincrew4311%11% 2 a day, more than 2 of the other 4 years-
Stations82%3% 0 a day, more than 1 of the other 4 years-
Operations41%5% 0 a day, the least in 5 years2
Operator, other9925%7% 4 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T67
MPRail / wheel interface, adhesion problems (including ice on the running rail)60
TGDriver38
M8Technical failures above the Solebar31
OEFailure to lay Sandite or operate Railhead Conditioning train as programmed25
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards14
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.11
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)11
VHPassenger Communication cord, door egress or emergency train alarm operated11
ACWaiting Train preparation or completion of TOPS list/RT39739
Since 2018
CodeWhat Network Rail loggedMinutes
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)6,720
TGDriver5,461
M8Technical failures above the Solebar1,974
MPRail / wheel interface, adhesion problems (including ice on the running rail)1,884
Q3NZ Pumps T1,873
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)1,833
IBPoints failure (including no fault found)1,412
OCSignaller including mis-routing (not ERTM /ETCS related)1,381
OUDelays not Investigated by Network Rail1,374
M7Door and Door system faults1,157