387 delay minutes
The biggest share (25%) of the delay picked up at Milngavie in the four weeks to 9 December 2023 came from other operator causes.
93% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 17 | 4% | 8% | 1 a day, the least in 5 years | - |
| Signals, points and power | 6 | 2% | 16% | 0 a day, the least in 5 years | 12 |
| Weather and structures | 13 | 3% | 7% | 0 a day, more than 2 of the other 4 years | 1 |
| Autumn | 93 | 24% | 7% | 3 a day, more than 2 of the other 4 years | - |
| External | 4 | 1% | 4% | 0 a day, more than 1 of the other 4 years | - |
| Network management | 48 | 12% | 17% | 2 a day, more than 2 of the other 4 years | 6 |
| The operators' causes | |||||
| Train faults | 54 | 14% | 16% | 2 a day, more than 2 of the other 4 years | - |
| Traincrew | 43 | 11% | 11% | 2 a day, more than 2 of the other 4 years | - |
| Stations | 8 | 2% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 4 | 1% | 5% | 0 a day, the least in 5 years | 2 |
| Operator, other | 99 | 25% | 7% | 4 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 67 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 60 |
| TG | Driver | 38 |
| M8 | Technical failures above the Solebar | 31 |
| OE | Failure to lay Sandite or operate Railhead Conditioning train as programmed | 25 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 14 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 11 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 11 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 11 |
| AC | Waiting Train preparation or completion of TOPS list/RT3973 | 9 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 6,720 |
| TG | Driver | 5,461 |
| M8 | Technical failures above the Solebar | 1,974 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 1,884 |
| Q3 | NZ Pumps T | 1,873 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 1,833 |
| IB | Points failure (including no fault found) | 1,412 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,381 |
| OU | Delays not Investigated by Network Rail | 1,374 |
| M7 | Door and Door system faults | 1,157 |