281 delay minutes

The biggest share (21%) of the delay picked up at Markinch in the four weeks to 9 December 2023 came from faulty trains.

48% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power5720%16% 2 a day, the most in 5 years-
Weather and structures5620%7% 2 a day, more than 3 of the other 4 years-
Autumn114%7% 0 a day, more than 3 of the other 4 years-
External62%4% 0 a day, more than 3 of the other 4 years-
Network management5219%17% 2 a day, more than 3 of the other 4 years-
The operators' causes
Train faults6021%16% 2 a day, more than 3 of the other 4 years1
Traincrew176%11% 1 a day, more than 1 of the other 4 years-
Stations31%3% 0 a day, the least in 5 years-
Operations93%5% 0 a day, the most in 5 years-
Operator, other114%7% 0 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar52
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure46
X9Points failure caused by severe snow or ice where heaters are fitted and working as designed23
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)20
OCSignaller including mis-routing (not ERTM /ETCS related)20
TGDriver17
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure17
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions16
Q3NZ Pumps T11
MPRail / wheel interface, adhesion problems (including ice on the running rail)9
Since 2018
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar834
ZUNo Cause Identified After investigation by both Parties578
IBPoints failure (including no fault found)557
TGDriver554
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions536
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure499
ICTrack circuit failure (including no fault found)486
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure416
M8Technical failures above the Solebar400
IASignal failure (including no fault found)327