Moorgate
333 delay minutes
The biggest share (24%) of the delay picked up at Moorgate in the four weeks to 9 December 2023 came from how the network was run.
78% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 10 | 3% | 8% | 0 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 72 | 22% | 16% | 3 a day, more than 3 of the other 4 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 6 | 2% | 7% | 0 a day, more than 1 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | 1 |
| Network management | 79 | 24% | 17% | 3 a day, more than 1 of the other 4 years | 2 |
| The operators' causes | |||||
| Train faults | 32 | 10% | 16% | 1 a day, more than 1 of the other 4 years | 19 |
| Traincrew | 66 | 20% | 11% | 2 a day, more than 2 of the other 4 years | 10 |
| Stations | 20 | 6% | 3% | 1 a day, the most in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | 1 |
| Operator, other | 49 | 15% | 7% | 2 a day, more than 2 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 45 |
| MU | Depot operating problem | 29 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 24 |
| VB | Vandalism or theft | 24 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 21 |
| OU | Delays not Investigated by Network Rail | 16 |
| J0 | Telecom equipment radio failure (GSM-R) | 15 |
| TI | Traincrew rostering problem | 15 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 14 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 13 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 7,544 |
| TI | Traincrew rostering problem | 2,213 |
| M8 | Technical failures above the Solebar | 1,982 |
| MD | Technical failures below the solebar | 1,960 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,904 |
| I1 | Overhead line/third rail defect | 1,868 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,086 |
| MU | Depot operating problem | 1,006 |
| IA | Signal failure (including no fault found) | 935 |
| IB | Points failure (including no fault found) | 868 |