Morpeth
886 delay minutes
The biggest share (22%) of the delay picked up at Morpeth in the four weeks to 9 December 2023 came from weather and structures.
77% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 72 | 8% | 8% | 3 a day, more than 3 of the other 4 years | 1 |
| Signals, points and power | 44 | 5% | 16% | 2 a day, the least in 5 years | - |
| Weather and structures | 196 | 22% | 7% | 7 a day, the most in 5 years | - |
| Autumn | 18 | 2% | 7% | 1 a day, more than 2 of the other 4 years | - |
| External | 38 | 4% | 4% | 1 a day, more than 1 of the other 4 years | - |
| Network management | 170 | 19% | 17% | 6 a day, the most in 5 years | 18 |
| The operators' causes | |||||
| Train faults | 182 | 21% | 16% | 7 a day, more than 1 of the other 4 years | 2 |
| Traincrew | 65 | 7% | 11% | 2 a day, more than 2 of the other 4 years | 1 |
| Stations | 20 | 2% | 3% | 1 a day, the least in 5 years | - |
| Operations | 58 | 6% | 5% | 2 a day, the most in 5 years | - |
| Operator, other | 24 | 3% | 7% | 1 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 106 |
| OU | Delays not Investigated by Network Rail | 70 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 53 |
| TG | Driver | 50 |
| JK | Flooding not due to exceptional weather | 46 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 42 |
| MW | Weather - effect on T&RS equipment | 40 |
| TZ | Other Passenger Train Operating Company causes | 38 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 35 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 29 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 4,117 |
| IB | Points failure (including no fault found) | 3,154 |
| I1 | Overhead line/third rail defect | 2,461 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,323 |
| MD | Technical failures below the solebar | 2,164 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 2,044 |
| TG | Driver | 1,929 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,864 |
| IC | Track circuit failure (including no fault found) | 1,652 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 1,437 |