Leaves on the Line

Morpeth

MPT East Coast route
CSV JSON

886 delay minutes

The biggest share (22%) of the delay picked up at Morpeth in the four weeks to 9 December 2023 came from weather and structures.

77% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track728%8% 3 a day, more than 3 of the other 4 years1
Signals, points and power445%16% 2 a day, the least in 5 years-
Weather and structures19622%7% 7 a day, the most in 5 years-
Autumn182%7% 1 a day, more than 2 of the other 4 years-
External384%4% 1 a day, more than 1 of the other 4 years-
Network management17019%17% 6 a day, the most in 5 years18
The operators' causes
Train faults18221%16% 7 a day, more than 1 of the other 4 years2
Traincrew657%11% 2 a day, more than 2 of the other 4 years1
Stations202%3% 1 a day, the least in 5 years-
Operations586%5% 2 a day, the most in 5 years-
Operator, other243%7% 1 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)106
OUDelays not Investigated by Network Rail70
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.53
TGDriver50
JKFlooding not due to exceptional weather46
I8Animal Strike or Incursion within the control of Network Rail42
MWWeather - effect on T&RS equipment40
TZOther Passenger Train Operating Company causes38
M0Confirmed train cab based safety system fault (including GSMR)35
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail29
Since 2018
CodeWhat Network Rail loggedMinutes
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)4,117
IBPoints failure (including no fault found)3,154
I1Overhead line/third rail defect2,461
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,323
MDTechnical failures below the solebar2,164
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail2,044
TGDriver1,929
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,864
ICTrack circuit failure (including no fault found)1,652
MNBrake and brake systems faults; including wheel flats where no other cause had been identified1,437