Maesteg
1,843 delay minutes
The biggest share (28%) of the delay picked up at Maesteg in the four weeks to 9 December 2023 came from faulty trains.
88% of these minutes were knock-on from something that happened elsewhere first. 91% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 45 | 2% | 8% | 2 a day, the most in 5 years | - |
| Signals, points and power | 153 | 8% | 16% | 5 a day, more than 3 of the other 4 years | - |
| Weather and structures | 47 | 3% | 7% | 2 a day, more than 3 of the other 4 years | - |
| Autumn | 59 | 3% | 7% | 2 a day, the most in 5 years | - |
| External | 70 | 4% | 4% | 3 a day, more than 3 of the other 4 years | - |
| Network management | 201 | 11% | 17% | 7 a day, more than 2 of the other 4 years | 1 |
| The operators' causes | |||||
| Train faults | 511 | 28% | 16% | 18 a day, the most in 5 years | 3 |
| Traincrew | 419 | 23% | 11% | 15 a day, the most in 5 years | 2 |
| Stations | 151 | 8% | 3% | 5 a day, the most in 5 years | - |
| Operations | 124 | 7% | 5% | 4 a day, more than 2 of the other 4 years | - |
| Operator, other | 64 | 3% | 7% | 2 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 217 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 136 |
| T2 | Delay at unstaffed station to non-DOO train | 114 |
| MU | Depot operating problem | 103 |
| T3 | Waiting connections from other transport modes | 93 |
| M8 | Technical failures above the Solebar | 83 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 66 |
| TH | (Senior) Conductor/Train Manager | 59 |
| QI | Cautioning due to railhead leaf contamination | 58 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 57 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 3,602 |
| TG | Driver | 3,530 |
| ZY | Univestigated station overtime System Roll-up Only | 3,219 |
| T2 | Delay at unstaffed station to non-DOO train | 2,537 |
| TH | (Senior) Conductor/Train Manager | 2,203 |
| MD | Technical failures below the solebar | 2,124 |
| M8 | Technical failures above the Solebar | 1,803 |
| TZ | Other Passenger Train Operating Company causes | 1,725 |
| OU | Delays not Investigated by Network Rail | 1,550 |
| IA | Signal failure (including no fault found) | 1,467 |