Nantwich
1,512 delay minutes
The biggest share (42%) of the delay picked up at Nantwich in the four weeks to 9 December 2023 came from signal, points and power faults.
46% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 31 | 2% | 8% | 1 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 636 | 42% | 16% | 23 a day, the most in 5 years | - |
| Weather and structures | 53 | 4% | 7% | 2 a day, more than 2 of the other 4 years | - |
| Autumn | 145 | 10% | 7% | 5 a day, the most in 5 years | - |
| External | 14 | <1% | 4% | 1 a day, more than 2 of the other 4 years | - |
| Network management | 119 | 8% | 17% | 4 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 208 | 14% | 16% | 7 a day, the most in 5 years | - |
| Traincrew | 147 | 10% | 11% | 5 a day, more than 3 of the other 4 years | - |
| Stations | 28 | 2% | 3% | 1 a day, more than 1 of the other 4 years | - |
| Operations | 71 | 5% | 5% | 3 a day, more than 3 of the other 4 years | - |
| Operator, other | 61 | 4% | 7% | 2 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 444 |
| QI | Cautioning due to railhead leaf contamination | 135 |
| TG | Driver | 76 |
| IE | Signalling Functional Power Supply Failure | 72 |
| JT | Points failure caused by snow or frost where heaters are not fitted | 64 |
| TZ | Other Passenger Train Operating Company causes | 61 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 50 |
| M8 | Technical failures above the Solebar | 49 |
| M9 | Reported fleet equipment defect - no fault found | 39 |
| TI | Traincrew rostering problem | 38 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 3,867 |
| TG | Driver | 2,454 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 2,221 |
| MD | Technical failures below the solebar | 1,867 |
| TZ | Other Passenger Train Operating Company causes | 1,596 |
| M8 | Technical failures above the Solebar | 1,325 |
| T2 | Delay at unstaffed station to non-DOO train | 1,245 |
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 1,216 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 1,136 |
| OU | Delays not Investigated by Network Rail | 976 |