11 delay minutes

Most of the delay picked up at Newbridge in the four weeks to 9 December 2023 came from problems at stations.

100% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations11100%3%1
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
T2Delay at unstaffed station to non-DOO train11
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver76
MDTechnical failures below the solebar42
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps33
IBPoints failure (including no fault found)25
ZZUnexplained loss in running system Roll-up Only16
TZOther Passenger Train Operating Company causes15
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail12
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)12
T2Delay at unstaffed station to non-DOO train11
RBPassengers joining/alighting10