Newbridge
11 delay minutes
Most of the delay picked up at Newbridge in the four weeks to 9 December 2023 came from problems at stations.
100% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | 11 | 100% | 3% | 1 |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| T2 | Delay at unstaffed station to non-DOO train | 11 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 76 |
| MD | Technical failures below the solebar | 42 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 33 |
| IB | Points failure (including no fault found) | 25 |
| ZZ | Unexplained loss in running system Roll-up Only | 16 |
| TZ | Other Passenger Train Operating Company causes | 15 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 12 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 12 |
| T2 | Delay at unstaffed station to non-DOO train | 11 |
| RB | Passengers joining/alighting | 10 |