New Cumnock
590 delay minutes
Most of the delay picked up at New Cumnock in the four weeks to 9 December 2023 came from how the network was run.
0% of these minutes were knock-on from something that happened elsewhere first. 47% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 24 | 4% | 16% | 1 a day, more than 1 of the other 4 years | - |
| Weather and structures | 196 | 33% | 7% | 7 a day, the most in 5 years | - |
| Autumn | 4 | <1% | 7% | 0 a day, the least in 5 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 357 | 61% | 17% | 13 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 4 | <1% | 16% | 0 a day, more than 1 of the other 4 years | - |
| Traincrew | 2 | <1% | 11% | 0 a day, more than 3 of the other 4 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 4 | <1% | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JF | Off track asset defects or issues on the NR network (not due to vandalism or weather or part of station infrastructure) | 311 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 116 |
| JK | Flooding not due to exceptional weather | 77 |
| ZU | No Cause Identified After investigation by both Parties | 30 |
| IA | Signal failure (including no fault found) | 18 |
| OL | Signal Box not open during booked hours | 14 |
| M8 | Technical failures above the Solebar | 4 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 4 |
| Q3 | NZ Pumps T | 4 |
| IE | Signalling Functional Power Supply Failure | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 2,788 |
| ZU | No Cause Identified After investigation by both Parties | 2,185 |
| JF | Off track asset defects or issues on the NR network (not due to vandalism or weather or part of station infrastructure) | 1,150 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 559 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 431 |
| IA | Signal failure (including no fault found) | 355 |
| MD | Technical failures below the solebar | 354 |
| TG | Driver | 348 |
| OL | Signal Box not open during booked hours | 297 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 275 |