New Cumnock

NCK Scotland route
CSV JSON

590 delay minutes

Most of the delay picked up at New Cumnock in the four weeks to 9 December 2023 came from how the network was run.

0% of these minutes were knock-on from something that happened elsewhere first. 47% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power244%16% 1 a day, more than 1 of the other 4 years-
Weather and structures19633%7% 7 a day, the most in 5 years-
Autumn4<1%7% 0 a day, the least in 5 years-
External--4% 0 a day, the least in 5 years-
Network management35761%17% 13 a day, the most in 5 years-
The operators' causes
Train faults4<1%16% 0 a day, more than 1 of the other 4 years-
Traincrew2<1%11% 0 a day, more than 3 of the other 4 years-
Stations--3% 0 a day, the least in 5 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other4<1%7% 0 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
JFOff track asset defects or issues on the NR network (not due to vandalism or weather or part of station infrastructure)311
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions116
JKFlooding not due to exceptional weather77
ZUNo Cause Identified After investigation by both Parties30
IASignal failure (including no fault found)18
OLSignal Box not open during booked hours14
M8Technical failures above the Solebar4
MPRail / wheel interface, adhesion problems (including ice on the running rail)4
Q3NZ Pumps T4
IESignalling Functional Power Supply Failure3
Since 2018
CodeWhat Network Rail loggedMinutes
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions2,788
ZUNo Cause Identified After investigation by both Parties2,185
JFOff track asset defects or issues on the NR network (not due to vandalism or weather or part of station infrastructure)1,150
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure559
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail431
IASignal failure (including no fault found)355
MDTechnical failures below the solebar354
TGDriver348
OLSignal Box not open during booked hours297
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)275