Newcastle
3,487 delay minutes
The biggest share (19%) of the delay picked up at Newcastle in the four weeks to 9 December 2023 came from faulty trains.
48% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 335 | 10% | 8% | 12 a day, more than 3 of the other 4 years | 6 |
| Signals, points and power | 414 | 12% | 16% | 15 a day, more than 3 of the other 4 years | 16 |
| Weather and structures | 468 | 13% | 7% | 17 a day, more than 3 of the other 4 years | 25 |
| Autumn | 46 | 1% | 7% | 2 a day, more than 1 of the other 4 years | 1 |
| External | 78 | 2% | 4% | 3 a day, more than 2 of the other 4 years | 6 |
| Network management | 413 | 12% | 17% | 15 a day, more than 3 of the other 4 years | 144 |
| The operators' causes | |||||
| Train faults | 671 | 19% | 16% | 24 a day, more than 1 of the other 4 years | 24 |
| Traincrew | 609 | 17% | 11% | 22 a day, more than 2 of the other 4 years | 66 |
| Stations | 154 | 4% | 3% | 6 a day, more than 3 of the other 4 years | - |
| Operations | 240 | 7% | 5% | 9 a day, the most in 5 years | 7 |
| Operator, other | 60 | 2% | 7% | 2 a day, the least in 5 years | 7 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 331 |
| JK | Flooding not due to exceptional weather | 265 |
| I1 | Overhead line/third rail defect | 259 |
| OU | Delays not Investigated by Network Rail | 198 |
| TH | (Senior) Conductor/Train Manager | 182 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 169 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 166 |
| M8 | Technical failures above the Solebar | 145 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 101 |
| RB | Passengers joining/alighting | 97 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 20,699 |
| MU | Depot operating problem | 8,240 |
| MD | Technical failures below the solebar | 7,398 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 6,281 |
| M8 | Technical failures above the Solebar | 6,078 |
| I1 | Overhead line/third rail defect | 5,726 |
| TH | (Senior) Conductor/Train Manager | 5,079 |
| IB | Points failure (including no fault found) | 4,836 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 4,249 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 3,764 |