337 delay minutes

Most of the delay picked up at Neilston in the four weeks to 9 December 2023 came from weather and structures.

26% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power--16% 0 a day, the least in 5 years-
Weather and structures20862%7% 7 a day, the most in 5 years5
Autumn247%7% 1 a day, more than 3 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management3611%17% 1 a day, the most in 5 years7
The operators' causes
Train faults237%16% 1 a day, more than 1 of the other 4 years3
Traincrew237%11% 1 a day, the most in 5 years-
Stations--3% 0 a day, the least in 5 years-
Operations3<1%5% 0 a day, more than 2 of the other 4 years-
Operator, other206%7% 1 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
X9Points failure caused by severe snow or ice where heaters are fitted and working as designed208
MPRail / wheel interface, adhesion problems (including ice on the running rail)20
Q3NZ Pumps T20
TGDriver19
M7Door and Door system faults17
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)9
QMTrain schedule/STP Process including erroneous simplifiers8
OARegulation Decision Made With Best Endeavours7
QAWTT schedule and or LTP Process including erroneous simplifiers6
OBDelayed by signaller not applying applicable regulating policy4
Since 2018
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)616
TGDriver529
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)407
JSCondition of Track TSR outside the Timetable Planning Rules344
M8Technical failures above the Solebar312
M7Door and Door system faults302
MPRail / wheel interface, adhesion problems (including ice on the running rail)300
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards284
X9Points failure caused by severe snow or ice where heaters are fitted and working as designed265
X8Animal Strike or incursion not within the control of Network Rail239