Neilston
337 delay minutes
Most of the delay picked up at Neilston in the four weeks to 9 December 2023 came from weather and structures.
26% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | - | - | 16% | 0 a day, the least in 5 years | - |
| Weather and structures | 208 | 62% | 7% | 7 a day, the most in 5 years | 5 |
| Autumn | 24 | 7% | 7% | 1 a day, more than 3 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 36 | 11% | 17% | 1 a day, the most in 5 years | 7 |
| The operators' causes | |||||
| Train faults | 23 | 7% | 16% | 1 a day, more than 1 of the other 4 years | 3 |
| Traincrew | 23 | 7% | 11% | 1 a day, the most in 5 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | 3 | <1% | 5% | 0 a day, more than 2 of the other 4 years | - |
| Operator, other | 20 | 6% | 7% | 1 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X9 | Points failure caused by severe snow or ice where heaters are fitted and working as designed | 208 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 20 |
| Q3 | NZ Pumps T | 20 |
| TG | Driver | 19 |
| M7 | Door and Door system faults | 17 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 9 |
| QM | Train schedule/STP Process including erroneous simplifiers | 8 |
| OA | Regulation Decision Made With Best Endeavours | 7 |
| QA | WTT schedule and or LTP Process including erroneous simplifiers | 6 |
| OB | Delayed by signaller not applying applicable regulating policy | 4 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 616 |
| TG | Driver | 529 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 407 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 344 |
| M8 | Technical failures above the Solebar | 312 |
| M7 | Door and Door system faults | 302 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 300 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 284 |
| X9 | Points failure caused by severe snow or ice where heaters are fitted and working as designed | 265 |
| X8 | Animal Strike or incursion not within the control of Network Rail | 239 |