Newcraighall
713 delay minutes
The biggest share (18%) of the delay picked up at Newcraighall in the four weeks to 9 December 2023 came from faulty trains.
86% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 17 | 2% | 8% | 1 a day, the least in 5 years | - |
| Signals, points and power | 43 | 6% | 16% | 2 a day, more than 1 of the other 4 years | - |
| Weather and structures | 83 | 12% | 7% | 3 a day, more than 2 of the other 4 years | - |
| Autumn | 27 | 4% | 7% | 1 a day, the least in 5 years | - |
| External | 29 | 4% | 4% | 1 a day, more than 1 of the other 4 years | - |
| Network management | 91 | 13% | 17% | 3 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 128 | 18% | 16% | 5 a day, more than 1 of the other 4 years | - |
| Traincrew | 81 | 11% | 11% | 3 a day, more than 1 of the other 4 years | - |
| Stations | 115 | 16% | 3% | 4 a day, the most in 5 years | - |
| Operations | 74 | 10% | 5% | 3 a day, more than 3 of the other 4 years | - |
| Operator, other | 26 | 4% | 7% | 1 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 72 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 59 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 45 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 41 |
| MU | Depot operating problem | 36 |
| M8 | Technical failures above the Solebar | 29 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 29 |
| RB | Passengers joining/alighting | 24 |
| Q3 | NZ Pumps T | 21 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 20 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 3,495 |
| MD | Technical failures below the solebar | 3,325 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 2,732 |
| M8 | Technical failures above the Solebar | 1,546 |
| MU | Depot operating problem | 1,281 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 1,119 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 954 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 902 |
| M7 | Door and Door system faults | 883 |
| RB | Passengers joining/alighting | 867 |