Leaves on the Line

Newark North Gate

NNG East Coast route
CSV JSON

3,542 delay minutes

Most of the delay picked up at Newark North Gate in the four weeks to 9 December 2023 came from signal, points and power faults.

24% of these minutes were knock-on from something that happened elsewhere first. 34% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track662%8% 2 a day, more than 1 of the other 4 years-
Signals, points and power2,66175%16% 95 a day, the most in 5 years4
Weather and structures862%7% 3 a day, more than 3 of the other 4 years-
Autumn1013%7% 4 a day, the most in 5 years-
External692%4% 2 a day, more than 2 of the other 4 years-
Network management1795%17% 6 a day, more than 2 of the other 4 years-
The operators' causes
Train faults2146%16% 8 a day, more than 2 of the other 4 years-
Traincrew391%11% 1 a day, more than 1 of the other 4 years1
Stations361%3% 1 a day, more than 2 of the other 4 years-
Operations622%5% 2 a day, more than 3 of the other 4 years-
Operator, other31<1%7% 1 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
I1Overhead line/third rail defect2,466
QJSpecial working for leaf-fall track circuit operation91
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)85
IISignalling lineside cable fault58
OUDelays not Investigated by Network Rail58
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail58
I8Animal Strike or Incursion within the control of Network Rail44
IASignal failure (including no fault found)40
M7Door and Door system faults33
TGDriver32
Since 2018
CodeWhat Network Rail loggedMinutes
I1Overhead line/third rail defect6,299
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.5,421
IBPoints failure (including no fault found)4,548
MDTechnical failures below the solebar3,700
MBElectic Loco failure, defect, attention3,184
IISignalling lineside cable fault2,858
MNBrake and brake systems faults; including wheel flats where no other cause had been identified2,688
ICTrack circuit failure (including no fault found)2,685
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail2,656
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)2,434