The biggest share (29%) of the delay picked up at Ninian Park in the four weeks to 9 December 2023 came from faulty trains.

95% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track233%8% 1 a day, the most in 5 years-
Signals, points and power9513%16% 3 a day, more than 2 of the other 4 years1
Weather and structures91%7% 0 a day, more than 2 of the other 4 years-
Autumn--7% 0 a day, the least in 5 years-
External5<1%4% 0 a day, more than 1 of the other 4 years-
Network management10714%17% 4 a day, more than 1 of the other 4 years55
The operators' causes
Train faults22129%16% 8 a day, more than 2 of the other 4 years1
Traincrew14820%11% 5 a day, the most in 5 years-
Stations527%3% 2 a day, more than 2 of the other 4 years-
Operations8311%5% 3 a day, more than 3 of the other 4 years-
Operator, other7<1%7% 0 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver101
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps89
TZOther Passenger Train Operating Company causes71
J3Axle Counter Failure55
T2Delay at unstaffed station to non-DOO train44
OCSignaller including mis-routing (not ERTM /ETCS related)40
MUDepot operating problem30
IBPoints failure (including no fault found)26
M7Door and Door system faults24
IRBroken/cracked/twisted/buckled/flawed rail23
Since 2018
CodeWhat Network Rail loggedMinutes
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps2,505
TGDriver2,450
MDTechnical failures below the solebar1,816
TZOther Passenger Train Operating Company causes1,635
T2Delay at unstaffed station to non-DOO train1,619
TH(Senior) Conductor/Train Manager1,489
OUDelays not Investigated by Network Rail1,434
M8Technical failures above the Solebar1,353
MUDepot operating problem1,163
OCSignaller including mis-routing (not ERTM /ETCS related)1,126