Leaves on the Line

Nairn

NRN Scotland route
CSV JSON

425 delay minutes

The biggest share (27%) of the delay picked up at Nairn in the four weeks to 9 December 2023 came from how the network was run.

59% of these minutes were knock-on from something that happened elsewhere first. 87% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track72%8% 0 a day, more than 2 of the other 4 years-
Signals, points and power7417%16% 3 a day, more than 2 of the other 4 years-
Weather and structures8921%7% 3 a day, the most in 5 years-
Autumn92%7% 0 a day, more than 3 of the other 4 years-
External102%4% 0 a day, more than 3 of the other 4 years-
Network management11527%17% 4 a day, more than 3 of the other 4 years-
The operators' causes
Train faults5413%16% 2 a day, more than 3 of the other 4 years-
Traincrew338%11% 1 a day, the most in 5 years-
Stations72%3% 0 a day, more than 2 of the other 4 years-
Operations184%5% 1 a day, the most in 5 years-
Operator, other92%7% 0 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure63
J4Infrastructure Safety Issue Reported by Member of the Public - No Fault Found53
IKTelecom equipment failure (including no fault found)44
ZUNo Cause Identified After investigation by both Parties41
TGDriver33
X9Points failure caused by severe snow or ice where heaters are fitted and working as designed23
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles18
M7Door and Door system faults14
MNBrake and brake systems faults; including wheel flats where no other cause had been identified14
M8Technical failures above the Solebar12
Since 2018
CodeWhat Network Rail loggedMinutes
ZUNo Cause Identified After investigation by both Parties2,578
TGDriver1,242
MDTechnical failures below the solebar1,104
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions973
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles903
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure847
M8Technical failures above the Solebar690
IKTelecom equipment failure (including no fault found)688
OCSignaller including mis-routing (not ERTM /ETCS related)626
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)527