Nairn
425 delay minutes
The biggest share (27%) of the delay picked up at Nairn in the four weeks to 9 December 2023 came from how the network was run.
59% of these minutes were knock-on from something that happened elsewhere first. 87% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 7 | 2% | 8% | 0 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 74 | 17% | 16% | 3 a day, more than 2 of the other 4 years | - |
| Weather and structures | 89 | 21% | 7% | 3 a day, the most in 5 years | - |
| Autumn | 9 | 2% | 7% | 0 a day, more than 3 of the other 4 years | - |
| External | 10 | 2% | 4% | 0 a day, more than 3 of the other 4 years | - |
| Network management | 115 | 27% | 17% | 4 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 54 | 13% | 16% | 2 a day, more than 3 of the other 4 years | - |
| Traincrew | 33 | 8% | 11% | 1 a day, the most in 5 years | - |
| Stations | 7 | 2% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | 18 | 4% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 9 | 2% | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 63 |
| J4 | Infrastructure Safety Issue Reported by Member of the Public - No Fault Found | 53 |
| IK | Telecom equipment failure (including no fault found) | 44 |
| ZU | No Cause Identified After investigation by both Parties | 41 |
| TG | Driver | 33 |
| X9 | Points failure caused by severe snow or ice where heaters are fitted and working as designed | 23 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 18 |
| M7 | Door and Door system faults | 14 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 14 |
| M8 | Technical failures above the Solebar | 12 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZU | No Cause Identified After investigation by both Parties | 2,578 |
| TG | Driver | 1,242 |
| MD | Technical failures below the solebar | 1,104 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 973 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 903 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 847 |
| M8 | Technical failures above the Solebar | 690 |
| IK | Telecom equipment failure (including no fault found) | 688 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 626 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 527 |