Neath
989 delay minutes
The biggest share (36%) of the delay picked up at Neath in the four weeks to 9 December 2023 came from faulty trains.
70% of these minutes were knock-on from something that happened elsewhere first. 93% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 65 | 7% | 8% | 2 a day, the most in 5 years | - |
| Signals, points and power | 85 | 9% | 16% | 3 a day, the most in 5 years | - |
| Weather and structures | 30 | 3% | 7% | 1 a day, more than 3 of the other 4 years | - |
| Autumn | 10 | <1% | 7% | 0 a day, more than 2 of the other 4 years | - |
| External | 6 | <1% | 4% | 0 a day, more than 3 of the other 4 years | - |
| Network management | 86 | 9% | 17% | 3 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 358 | 36% | 16% | 13 a day, the most in 5 years | - |
| Traincrew | 151 | 15% | 11% | 5 a day, the most in 5 years | - |
| Stations | 97 | 10% | 3% | 3 a day, the most in 5 years | - |
| Operations | 100 | 10% | 5% | 4 a day, the most in 5 years | - |
| Operator, other | 3 | <1% | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 178 |
| TG | Driver | 103 |
| T2 | Delay at unstaffed station to non-DOO train | 74 |
| M8 | Technical failures above the Solebar | 70 |
| TR | Train Operating Company Directive | 55 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 45 |
| TZ | Other Passenger Train Operating Company causes | 37 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 36 |
| MD | Technical failures below the solebar | 33 |
| TI | Traincrew rostering problem | 27 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 2,991 |
| MD | Technical failures below the solebar | 2,129 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 1,619 |
| TG | Driver | 1,556 |
| T2 | Delay at unstaffed station to non-DOO train | 1,105 |
| J3 | Axle Counter Failure | 1,084 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 934 |
| M8 | Technical failures above the Solebar | 869 |
| OU | Delays not Investigated by Network Rail | 861 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 771 |