Newton (S Lanarks)
1,147 delay minutes
The biggest share (21%) of the delay picked up at Newton (S Lanarks) in the four weeks to 9 December 2023 came from weather and structures.
67% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 30 | 3% | 8% | 1 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 59 | 5% | 16% | 2 a day, more than 1 of the other 4 years | 3 |
| Weather and structures | 244 | 21% | 7% | 9 a day, the most in 5 years | 4 |
| Autumn | 174 | 15% | 7% | 6 a day, more than 3 of the other 4 years | - |
| External | 3 | <1% | 4% | 0 a day, more than 1 of the other 4 years | - |
| Network management | 127 | 11% | 17% | 5 a day, more than 2 of the other 4 years | 3 |
| The operators' causes | |||||
| Train faults | 183 | 16% | 16% | 7 a day, the most in 5 years | 5 |
| Traincrew | 118 | 10% | 11% | 4 a day, the most in 5 years | - |
| Stations | 17 | 1% | 3% | 1 a day, more than 1 of the other 4 years | - |
| Operations | 39 | 3% | 5% | 1 a day, more than 1 of the other 4 years | - |
| Operator, other | 155 | 13% | 7% | 6 a day, more than 3 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X9 | Points failure caused by severe snow or ice where heaters are fitted and working as designed | 202 |
| Q3 | NZ Pumps T | 120 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 115 |
| TG | Driver | 101 |
| M8 | Technical failures above the Solebar | 53 |
| M7 | Door and Door system faults | 38 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 36 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 30 |
| QH | Adhesion problems due to leaf contamination | 27 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 27 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 3,004 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 2,571 |
| IB | Points failure (including no fault found) | 1,550 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 1,422 |
| Q3 | NZ Pumps T | 1,347 |
| M8 | Technical failures above the Solebar | 1,334 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 1,054 |
| M7 | Door and Door system faults | 976 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 910 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 820 |