Newhaven Town
347 delay minutes
Most of the delay picked up at Newhaven Town in the four weeks to 9 December 2023 came from track faults.
8% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 269 | 78% | 8% | 10 a day, the most in 5 years | - |
| Signals, points and power | 7 | 2% | 16% | 0 a day, the least in 5 years | - |
| Weather and structures | 3 | <1% | 7% | 0 a day, more than 1 of the other 4 years | - |
| Autumn | - | - | 7% | 0 a day, the least in 5 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 32 | 9% | 17% | 1 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 22 | 6% | 16% | 1 a day, more than 2 of the other 4 years | - |
| Traincrew | 11 | 3% | 11% | 0 a day, more than 2 of the other 4 years | - |
| Stations | 3 | <1% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | - | - | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 269 |
| MD | Technical failures below the solebar | 17 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 17 |
| TG | Driver | 11 |
| I1 | Overhead line/third rail defect | 7 |
| MF | Engineering non-technical delays associated with Engineering staff who are not based in an Engineering depot e.g. Cleaners | 5 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 5 |
| OM | Technical failure associated with a Railhead conditioning train | 5 |
| I6 | Delays as a result of line blocks / track patrols (including late handback) | 3 |
| JK | Flooding not due to exceptional weather | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,483 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 1,211 |
| IC | Track circuit failure (including no fault found) | 928 |
| TG | Driver | 618 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 615 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 529 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 440 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 297 |
| M8 | Technical failures above the Solebar | 285 |
| IA | Signal failure (including no fault found) | 256 |