347 delay minutes

Most of the delay picked up at Newhaven Town in the four weeks to 9 December 2023 came from track faults.

8% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track26978%8% 10 a day, the most in 5 years-
Signals, points and power72%16% 0 a day, the least in 5 years-
Weather and structures3<1%7% 0 a day, more than 1 of the other 4 years-
Autumn--7% 0 a day, the least in 5 years-
External--4% 0 a day, the least in 5 years-
Network management329%17% 1 a day, more than 2 of the other 4 years-
The operators' causes
Train faults226%16% 1 a day, more than 2 of the other 4 years-
Traincrew113%11% 0 a day, more than 2 of the other 4 years-
Stations3<1%3% 0 a day, more than 2 of the other 4 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other--7% 0 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.269
MDTechnical failures below the solebar17
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)17
TGDriver11
I1Overhead line/third rail defect7
MFEngineering non-technical delays associated with Engineering staff who are not based in an Engineering depot e.g. Cleaners5
OCSignaller including mis-routing (not ERTM /ETCS related)5
OMTechnical failure associated with a Railhead conditioning train5
I6Delays as a result of line blocks / track patrols (including late handback)3
JKFlooding not due to exceptional weather3
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,483
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)1,211
ICTrack circuit failure (including no fault found)928
TGDriver618
OCSignaller including mis-routing (not ERTM /ETCS related)615
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)529
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure440
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles297
M8Technical failures above the Solebar285
IASignal failure (including no fault found)256