3,004 delay minutes

The biggest share (36%) of the delay picked up at Norwood Junction in the four weeks to 9 December 2023 came from how the network was run.

74% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1003%8% 4 a day, the least in 5 years-
Signals, points and power55118%16% 20 a day, more than 3 of the other 4 years-
Weather and structures1214%7% 4 a day, more than 3 of the other 4 years-
Autumn16<1%7% 1 a day, the least in 5 years-
External1906%4% 7 a day, the most in 5 years8
Network management1,08936%17% 39 a day, the least in 5 years3
The operators' causes
Train faults1886%16% 7 a day, the least in 5 years-
Traincrew30510%11% 11 a day, the least in 5 years2
Stations2157%3% 8 a day, more than 2 of the other 4 years-
Operations1033%5% 4 a day, more than 2 of the other 4 years-
Operator, other1264%7% 5 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)311
TGDriver220
OCSignaller including mis-routing (not ERTM /ETCS related)194
OBDelayed by signaller not applying applicable regulating policy193
IISignalling lineside cable fault167
RBPassengers joining/alighting130
IBPoints failure (including no fault found)119
QAWTT schedule and or LTP Process including erroneous simplifiers117
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)98
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)97
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)33,350
TGDriver28,055
OBDelayed by signaller not applying applicable regulating policy19,932
OCSignaller including mis-routing (not ERTM /ETCS related)17,813
IRBroken/cracked/twisted/buckled/flawed rail14,216
ICTrack circuit failure (including no fault found)13,311
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.9,025
M8Technical failures above the Solebar7,258
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure6,944
VHPassenger Communication cord, door egress or emergency train alarm operated6,192