3,004 delay minutes
The biggest share (36%) of the delay picked up at Norwood Junction in the four weeks to 9 December 2023 came from how the network was run.
74% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 100 | 3% | 8% | 4 a day, the least in 5 years | - |
| Signals, points and power | 551 | 18% | 16% | 20 a day, more than 3 of the other 4 years | - |
| Weather and structures | 121 | 4% | 7% | 4 a day, more than 3 of the other 4 years | - |
| Autumn | 16 | <1% | 7% | 1 a day, the least in 5 years | - |
| External | 190 | 6% | 4% | 7 a day, the most in 5 years | 8 |
| Network management | 1,089 | 36% | 17% | 39 a day, the least in 5 years | 3 |
| The operators' causes | |||||
| Train faults | 188 | 6% | 16% | 7 a day, the least in 5 years | - |
| Traincrew | 305 | 10% | 11% | 11 a day, the least in 5 years | 2 |
| Stations | 215 | 7% | 3% | 8 a day, more than 2 of the other 4 years | - |
| Operations | 103 | 3% | 5% | 4 a day, more than 2 of the other 4 years | - |
| Operator, other | 126 | 4% | 7% | 5 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 311 |
| TG | Driver | 220 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 194 |
| OB | Delayed by signaller not applying applicable regulating policy | 193 |
| II | Signalling lineside cable fault | 167 |
| RB | Passengers joining/alighting | 130 |
| IB | Points failure (including no fault found) | 119 |
| QA | WTT schedule and or LTP Process including erroneous simplifiers | 117 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 98 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 97 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 33,350 |
| TG | Driver | 28,055 |
| OB | Delayed by signaller not applying applicable regulating policy | 19,932 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 17,813 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 14,216 |
| IC | Track circuit failure (including no fault found) | 13,311 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 9,025 |
| M8 | Technical failures above the Solebar | 7,258 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 6,944 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 6,192 |